US20080145232A1 - Wind turbine tower suspension means - Google Patents

Wind turbine tower suspension means Download PDF

Info

Publication number
US20080145232A1
US20080145232A1 US11/932,576 US93257607A US2008145232A1 US 20080145232 A1 US20080145232 A1 US 20080145232A1 US 93257607 A US93257607 A US 93257607A US 2008145232 A1 US2008145232 A1 US 2008145232A1
Authority
US
United States
Prior art keywords
wind turbine
turbine tower
magnetic
tower
suspension unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/932,576
Inventor
Borge Ollgaard
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vestas Wind Systems AS
Original Assignee
Vestas Wind Systems AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=27635722&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=US20080145232(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Vestas Wind Systems AS filed Critical Vestas Wind Systems AS
Priority to US11/932,576 priority Critical patent/US20080145232A1/en
Publication of US20080145232A1 publication Critical patent/US20080145232A1/en
Priority to US12/726,758 priority patent/US8938931B2/en
Priority to US13/167,379 priority patent/US8567131B2/en
Priority to US14/564,322 priority patent/US9261081B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B1/1903Connecting nodes specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • E04H12/085Details of flanges for tubular masts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/342Arrangements for stacking tower sections on top of each other
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/91Mounting on supporting structures or systems on a stationary structure
    • F05B2240/912Mounting on supporting structures or systems on a stationary structure on a tower
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2260/00Function
    • F05B2260/30Retaining components in desired mutual position
    • F05B2260/302Retaining components in desired mutual position by means of magnetic or electromagnetic forces
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Definitions

  • the present invention relates to a method of mounting elements in a wind turbine tower.
  • wind turbine towers carry the nacelle and the rotor of a wind turbine in order to allow for the desired rotation of the rotor and to raise the rotor into a position as far as possible from the ground as wind speeds typically increase with the distance to the ground.
  • a wind turbine tower may be constructed according to several different principles, e.g. as tubular steel towers, lattice towers, or even concrete towers.
  • the steel towers typically comprise an interior with platforms, ladders, illumination means, power cables, lifts, etc.
  • the components are welded to the inner surface of the steel tower section, or directly attached to the fittings, which have been welded and/or bolted to the tower.
  • the invention relates to a method of mounting elements in a wind turbine tower ( 10 , 11 , 12 , 13 , 14 ), whereby said elements are partly or completely attached to the wind turbine tower ( 10 , 11 , 12 , 13 , 14 ) by means of a magnetic attraction forces.
  • the wind turbine suspension units may be attached to the wind turbine tower, preferably completely or partly to the inner wall by means of magnetic attraction forces, thereby preventing structure-weakening attachments to the tower or part of the tower.
  • a wind turbine tower may comprise of a number of tower sections.
  • Permanent magnetic materials may be relatively stable and the necessary attraction forces may be maintained over a relatively long period.
  • a suspension unit according to the invention may advantageously be provided with permanent magnets.
  • a typical application of a suspension unit may be regarded as a “hybrid suspension” in the sense that the magnetic forces are primarily applied in order to handle the transverse suspension forces, whereas a mechanical suspension forces primarily deal with vertical suspension, i.e. typically gravity induced force on the suspended structure.
  • suspension units may be applied for suspension based on magnetic attraction forces only if the magnetic attraction forces available are sufficient for the desired attachment.
  • wind turbine tower components may be mechanically suspended between the end point(s) of the turbine tower or wind turbine tower sections, thereby avoiding weakening of the wind turbine tower, which is typically caused by welding.
  • the magnetic attachment means may then form a supplement to the mechanical suspension in areas in which no mechanical attachment is desired or possible.
  • fixation areas comprise flanges ( 131 , 142 ) adapted to joining the wind turbine tower sections ( 11 , 12 , 13 , 14 ).
  • the suspension method may be applied in more or less traditional wind towers or tower sections.
  • the invention relates to a wind turbine tower suspension unit ( 20 ; 60 ), said wind turbine tower suspension unit ( 20 ; 60 ) comprising magnetic attachment means ( 24 ).
  • the wind turbine suspension unit may be attached to the wind turbine tower, preferably completely or partly to the inner wall by means of magnetic attraction forces.
  • a unit according to the invention may advantageously be applied for by attaching the interior of a wind turbine tower, such as a ladder, ladder parts, illumination means, lifts, platforms, power cables, etc.
  • improved suspension has been obtained since the desired attachment may be obtained by means of non-destructive attachment.
  • the material properties of the tower or tower modules may remain substantially unaffected when attaching components or fittings to the surface of the tower.
  • the amount of steel used for e.g. a tubular steel tower may be reduced significantly when avoiding or minimizing structure weakening joining process(es).
  • the permanent magnetic material comprises at least one anisotropic magnet.
  • said permanent magnetic material comprises permanent Neodym magnets
  • Neodym magnets are applied due to the fact that they feature strong magnetic attraction compared to other available magnetic materials.
  • said permanent magnetic material comprises permanent Samarium-Cobalt magnets
  • said wind turbine tower suspension unit ( 20 ; 60 ) comprises mechanical fixating means ( 22 ; 62 ), a further advantageous embodiment of the invention has been obtained.
  • the magnets applied should preferably feature a relatively high magnetic energy level and be resistant to demagnetizing, i.e. maintain the magnetic properties in different environments, both during mounting and during normal variations in e.g. temperature, humidity, etc.
  • Interior elements may then be attached to the mechanical fixation means by means of traditional attachment precautions.
  • said wind turbine tower suspension unit ( 20 ) comprises at least one barrier ( 23 ) encapsulating said magnetic attachment means ( 24 ), a further advantageous embodiment of the invention has been obtained.
  • degradation of especially the permanent magnetic material may be avoided simply by avoiding transportation of humidity into the magnet material.
  • barrier layer comprises rubber
  • a further advantageous embodiment of the invention has been obtained.
  • said unit comprises means for receiving mechanical attraction forces in at least one first direction and means for establishment of magnetic attraction forces in at least one second direction, said at least one other direction being substantially transverse in relation to said at least one first direction, a further advantageous embodiment of the invention has been obtained.
  • said unit comprises mechanical fixtures for receipt of standard mechanical fastening means, a further advantageous embodiment of the invention has been obtained.
  • the invention relates to a method of mounting suspension units whereby said units are attached to at least one wind turbine tower portion by means of computer-controlled positioning systems.
  • the invention relates to a method of mounting suspension units whereby an electromagnetically generated magnetic field is applied for complete or partly temporary demagnetization of the suspension when the suspension unit is positioned at the attachment location.
  • the invention relates to a method of de-attaching suspension units whereby an electromagnetically generated magnetic field is applied for complete or partly temporary demagnetization of the suspension unit, thereby facilitating de-attachment of the suspension unit by means of reduced de-attachment forces.
  • the invention relates to a method of re-arranging suspension units whereby an electromagnetically generated magnetic field is applied for complete or partly temporary demagnetization of the suspension unit, thereby facilitating rearrangement of the suspension unit.
  • the invention relates to a system of mutually attachable members, said system comprising at least one magnetic wind turbine tower portion, said system comprising at least one suspension unit ( 20 ; 60 ), said at least one suspension unit ( 20 ; 60 ) comprising at least one permanent magnetic portion ( 24 ), said at least one permanent magnetic portion ( 24 ) facilitating magnetic attachment of at least one suspension unit ( 20 ; 60 ) to said at least one magnetic wind turbine tower portion.
  • said at least one magnetic wind turbine tower portion comprises a wind turbine tower ( 11 , 12 , 13 , 14 ; 10 ), a further advantageous embodiment of the invention has been obtained.
  • said magnetic steel comprises steel S235 JR, JO, J2G3 or S 355 JO or J2G3, a further advantageous embodiment of the invention has been obtained.
  • Suspension unit comprising permanent magnet(s) according to the invention is suitable for fastening to the above-mentioned materials.
  • said at least one permanent magnetic portion ( 24 ) comprises a Neodym magnetic material or Samarium-Cobalt magnetic material, a further advantageous embodiment of the invention has been obtained.
  • said tower comprises at least two tower sections ( 11 , 12 , 13 , 14 ), a further advantageous embodiment of the invention has been obtained.
  • At least one of said tower sections comprises mechanical attachment areas ( 131 , 142 ) arranged in the upper and lower parts of said at least one tower section, a further advantageous embodiment of the invention has been obtained.
  • FIG. 1 a illustrates a wind turbine
  • FIG. 1 b illustrates a wind turbine tower according to an embodiment of the invention
  • FIG. 1 c illustrates a joining between two tower sections.
  • FIGS. 2 a and 2 b illustrate a suspension unit according to a preferred embodiment of the invention
  • FIG. 3 illustrates fixation of a ladder within a wind turbine tower according to an embodiment of the invention.
  • FIG. 4 illustrates assembly of a suspension unit according to one embodiment of the invention and a fitting
  • FIGS. 5 a and 5 b illustrate a further suspension unit according to the invention
  • FIG. 6 illustrates the main force directions of an applicable attachment according to one embodiment of the invention.
  • FIG. 7 illustrates the properties of permanent magnetic materials.
  • the production costs of the wind turbine towers are relatively high compared with the manufacturing costs of the complete wind turbine construction. Moreover, these costs increase proportionately with the height and especially if it exceeds around fifty meters.
  • FIG. 1 a illustrates a typical wind turbine.
  • the wind turbine comprises a tower 10 founded to the ground by means of a foundation.
  • the tower 10 carries a nacelle 1 and a rotor 2 .
  • FIG. 1 b shows the cross section of such an exemplary tubular steel tower.
  • the illustrated wind turbine tower 10 comprises a number of conical tower sections 11 , 12 , 13 and 14 .
  • the length of the sections 11 , 12 , 13 and 14 are h 1 , h 2 , h 3 , h 4 , respectively.
  • the complete tower is conical and each of the sections 11 , 12 , 13 and 14 is conical and the upper diameter is d 1 and the lower diameter is d 4 .
  • the towers may be assembled from these smaller, conical subsections 11 , 12 , 13 and 14 cut and molded into the right shape, and subsequently welded together.
  • the illustrated tower sections 11 , 12 , 13 , 14 have flanges 131 , 142 at both ends, and may be bolted together on the site.
  • the towers are conical (i.e. the diameter increases towards the base) in order to increase strength and save materials at the same time.
  • modern tower weights are 40 metric tonnes for a 50 m tower for a turbine with a 44 m rotor diameter (e.g. a 600 kW wind turbine), and 80 metric tonnes for a 60 metres tower for a 72 m rotor diameter (e.g. a 2000 kW wind turbine).
  • the illustrated tower may e.g. be an 80 (eighty) metric tonnes tower.
  • the lower and upper diameters d 4 and d 1 may e.g. be approximately 4.2 meters and 2.3 meters, respectively.
  • FIG. 1 c illustrates a detailed view of a joining of two sections 13 , 14 .
  • a lower flange 131 of the tower section 13 is bolted together with an upper flange 142 of the tower section 14 .
  • the other sections may be joined in the same way.
  • the interior components of the above-described tower of FIG. 1 b may typically be comprised by platforms 1110 , 1120 , 1130 , 1140 , ladders 111 , 112 , 113 and 114 illumination means 121 , 122 , 123 , power cables (not shown), lifts (not shown), etc (not shown).
  • the interior components are attached to the tower e.g. by means of suitable fittings attached to the inner surface of the tower.
  • the platforms 1110 , 1120 , 1130 , 1140 may e.g. be suspended to attachment areas located near the assembly joints of the tower fittings, e.g. the upper and lower flanges of the tower sections 11 , 12 , 13 , 14 .
  • the platform may simply be attached to these joinings, e.g. flanges, by means of wires fixed to the platform at the lower end and to the flanges at the upper end.
  • the platform is mechanically attached to the flange and hanging in the wires, whereas the platform comprises permanent magnetic suspension units providing magnetic fixation of the platform with respect to non-vertical excitation forces of the platform.
  • FIG. 2 a illustrates a wind turbine tower suspension unit 20 comprising a main body 21 and a mechanically connectable member or section 22 to which mechanical structures may be fixated by suitable fixation means.
  • the dimensions of the main body 21 of the illustrated unit may e.g. be approximately 200 mm ⁇ 50 mm ⁇ 25 mm and the weight may be approximately 1 ⁇ 2 kilogram.
  • FIG. 2 b shows a cross-section of the above-described wind turbine tower suspension unit 20 .
  • the unit comprises a magnet 24 comprising one or a group of magnets.
  • the magnet is a permanent magnet.
  • the magnet 24 is encapsulated by a barrier material 23 of e.g. rubber.
  • the barrier material should feature a relatively high friction coefficient, thereby maximizing the transversal conservative forces between the unit and the tower inner surface when the unit is attached to an inner surface by magnetic force in the usual direction.
  • the barrier material protects the magnet from humidity and dust, thereby preventing corrosion or other physical degradation of the magnet.
  • a mechanically connectable member or section 22 is fastened to the main body of the unit.
  • the magnet and the member or section 22 extend to the exterior of the unit and form a bolt, e.g. M10 ⁇ 30, at the end.
  • the bolt 22 may be fitted to a suitable nut, thereby providing fixation of a suitable fitting to the unit.
  • FIG. 2 c shows a further embodiment of the invention.
  • the illustrated suspension unit 200 comprises a U-shaped steel cover 250 arranged to be in galvanic contact with a permanent magnet 24 , such as Neodym.
  • the assembly has been formed with an upper sealing 230 .
  • the sealing is provided with a lip 231 adapted to engage with an underlying surface, thereby providing air-tight and water-proof enclosure around the magnet 24 once it is mounted.
  • the U-shape of the magnet provides an improved magnetic coupling to the underlying surface.
  • FIG. 2 d illustrates a further embodiment of the invention in which a suspension unit 200 comprises a magnet 24 arranged with a U-shaped magnetic conducting cover 250 .
  • a suitable sealing means 231 e.g. tectyle, etc.
  • FIG. 3 illustrates an advantageous embodiment of the invention.
  • the figure illustrates a cross-section of the tower section 13 illustrated in FIG. 1 b .
  • a ladder 113 is fixated to the inner surface 30 of the wind turbine tower section 13 .
  • the ladder is suspended mechanically in two suspensions to the tower section, an upper mechanical suspension 31 and a lower mechanical suspension 32 .
  • Bolting, welding, etc may e.g. obtain the suspension of the ladder to the tower.
  • the ladder is suspended in the tower by means of a number of wind turbine suspension units 20 , e.g. illustrated in FIGS. 2 a and 2 b , or derivatives thereof.
  • the units 20 are attached to the inner surface by means of magnetic forces established by the magnets of the units 20 , and the ladder may be attached to the units 20 e.g. by means of the fittings 22 of the units 20 .
  • the main fixation in the vertical direction is obtained by means of mechanical end-point fixation to the tower, the upper flange 132 and lower flange 131 of the tower section 31 , while the transverse fixation (i.e. the non-vertical) is obtained magnetically by means of the units 20 .
  • the vertical mechanical stress is primarily created by traditional mechanical attachment to the tower, e.g. by welding and/or bolting, while fixation of the ladder 31 is primarily obtained by magnetic fixation to the inner surface 30 of the tower section 13 .
  • the distance between the suspension unit 20 in the vertical direction may e.g. be between 0.5 meter and 4 meters depending on the requirements to the fixation.
  • a preferred vertical distance is between 1.5 to 2.3. metres.
  • a suspension unit according to the invention may be applied for fixation of several other interior components than the illustrated ladder.
  • a ladder construction may e.g. be fixated to the tower by the above-described provisions and the further interior components such as lamps, power cables, etc. may then be fixated to the ladder construction itself by traditional attachment mechanics, welding, bolting etc.
  • FIG. 4 illustrates a further embodiment of the invention in which a tube 41 (e.g. of a ladder, a platform fitting, etc.) comprises a fitting 42 which is attached to a suspension unit 20 by means of a nut (not shown) fitted to the bolt 22 of the suspension unit.
  • a tube 41 e.g. of a ladder, a platform fitting, etc.
  • a fitting 42 which is attached to a suspension unit 20 by means of a nut (not shown) fitted to the bolt 22 of the suspension unit.
  • the unit 20 may be magnetically attracted to an underlying surface, e.g. the above-described inner surface of a steel tower section wall, thereby establishing attachment by normal forces between the underlying surface and the tube 41 .
  • an underlying surface e.g. the above-described inner surface of a steel tower section wall
  • the fitting facilitates a degree of tolerance in the direction of the illustrated arrow between the fitting 42 and the bolt 22 of the suspension unit 20 .
  • the freedom of tolerance provides a certain degree of tolerance when attaching the suspension units 20 to a tower in the manner suggested by the invention.
  • FIG. 5 a illustrates a further embodiment of the invention.
  • the illustrated suspension unit 60 comprises a main body 61 and two bolts 61 .
  • the illustrated suspension unit 60 is constructed according to the principles outlined in the single-bolt version of the unit in FIG. 2 b.
  • FIG. 5 b illustrates the fitting of e.g. a steel bar 65 to the suspension unit 60 .
  • the steel bar 65 is mechanically fixated to the suspension unit 60 by means of a suitable fitting 66 by means of nuts (not shown).
  • FIGS. 6 a and 6 b illustrate a method of mounting a suspension unit 60 according to the invention to a magnetic surface (not shown), e.g. a steel wind turbine tower.
  • a suspension unit is arranged on e.g. a steel surface.
  • a nylon sheet 65 is located between the underlying surface and the suspension unit 60 . Due to the thickness of the sheet and the relatively low friction, the suspension unit 60 and the sheet 65 may be displaced relatively easily to the exact desired position.
  • FIGS. 7 a and 7 b illustrate the main force directions F V and F N acting on a suspendible element 90 in an attachment according to one embodiment of the invention.
  • the magnetic suspension provides transverse fixation of the suspended element established by means of normal force F N acting in the illustrated transverse direction.
  • This normal force F N may be exploited further, if friction members are applied between the suspension unit and the corresponding magnetic tower portion.
  • transverse force is established to counteract e.g. rotational movements (tangential movement tm) of e.g. a platform or a ladder suspension.
  • FIG. 8 illustrates some of the properties of different permanent magnetic materials.
  • the illustrated diagram illustrates the behavior of six groups of magnetic materials, G 1 to G 6 at a temperature of approximately 20 degrees Celsius.
  • the x-axis represents HcJ (Coercivity [kA/m] and the y-axis represents maximum energy product
  • Group G 1 comprises so-called Neodym magnets, NdFeB.
  • the Neodym magnets are some of the most powerful permanent magnets on the market.
  • Groups G 2 and G 3 comprise Sm x Co y magnets characterized by a high degree of stability with respect to variation in temperature.
  • Group G 2 refers to Sm 2 Co 17 and
  • Group G 3 refers to SmCo 5 .
  • Group G 4 refers to a further group of so-called low H c Sm x Co y magnets, Sm 2 Co 17 .
  • Group G 5 comprises a group of plastic-bounded Neodym magnet material NdFeB.
  • group G 6 comprises more traditional magnet materials such as Alnico and FeSr/FeBa materials.
  • Different magnetic materials may be applied in a suspension unit according to the invention.
  • the applied permanent magnetic materials are primarily selected from materials featuring a high energy potential
  • the materials are chosen from group G 1 , i.e. the Neodym-magnets.
  • Samarium-Cobalt magnets may be preferred.
  • suspension units may e.g. be combined by units having magnets from different groups, thereby creating a degree of redundancy.

Abstract

A method of mounting elements in a wind turbine tower, whereby the elements are partly or completely attached to the wind turbine tower by means of magnetic attraction forces. Wind turbine suspension units may be attached to the wind turbine tower, preferably completely or partly to the inner wall by means of magnetic attraction forces, which prevent structure-weakening attachments to the tower or part of the tower.

Description

    CROSS-REFERENCE TO RELATED APPLICATION
  • This application is a continuation of U.S. patent application Ser. No. 10/157,286 filed on 29 May 2002 which claims priority to Danish Patent Application No. 2002 00178 filed on 6 Feb. 2002, both of which said applications are incorporated herein by reference in their entirety.
  • TECHNICAL FIELD OF THE INVENTION
  • The present invention relates to a method of mounting elements in a wind turbine tower.
  • BRIEF DISCUSSION OF RELATED ART
  • Typically, wind turbine towers carry the nacelle and the rotor of a wind turbine in order to allow for the desired rotation of the rotor and to raise the rotor into a position as far as possible from the ground as wind speeds typically increase with the distance to the ground.
  • A wind turbine tower may be constructed according to several different principles, e.g. as tubular steel towers, lattice towers, or even concrete towers.
  • Most large wind turbines are delivered with tubular steel towers manufactured in sections of 20-30 meters with flanges at both ends, and bolted together on the site. The towers are typically conical in order to increase strength and save materials at the same time.
  • The steel towers typically comprise an interior with platforms, ladders, illumination means, power cables, lifts, etc. The components are welded to the inner surface of the steel tower section, or directly attached to the fittings, which have been welded and/or bolted to the tower.
  • One of several problems associated with the above-described wind turbine towers is that the welding or bolting of especially the interior tower components such as ladders, cables, etc., weaken the tower structure.
  • In some cases, it is possible to compensate for this problem by taking relatively costly precautions, which may, in turn, infer significant structural limitations for which no compensation is made.
  • BRIEF SUMMARY OF THE INVENTION
  • The invention relates to a method of mounting elements in a wind turbine tower (10, 11, 12, 13, 14), whereby said elements are partly or completely attached to the wind turbine tower (10, 11, 12, 13, 14) by means of a magnetic attraction forces.
  • According to the invention, the wind turbine suspension units may be attached to the wind turbine tower, preferably completely or partly to the inner wall by means of magnetic attraction forces, thereby preventing structure-weakening attachments to the tower or part of the tower.
  • According to the invention, a wind turbine tower may comprise of a number of tower sections.
  • When said magnetic attraction forces are established by means of permanent magnetic materials interacting with other magnetic materials, a further advantageous embodiment of the invention has been obtained.
  • Permanent magnetic materials may be relatively stable and the necessary attraction forces may be maintained over a relatively long period.
  • When said magnetic attraction forces are established by means of permanent magnetic materials comprised in a suspension unit (20; 60) interacting with magnetic materials forming at least a portion of a wind turbine tower, a further advantageous embodiment of the invention has been obtained.
  • If the wind turbine tower comprises a magnetic material, steel or the like, a suspension unit according to the invention may advantageously be provided with permanent magnets.
  • When said magnetic attraction forces are supplemented by mechanical fixation in at least one direction, a further advantageous embodiment of the invention has been obtained.
  • According to the invention, a typical application of a suspension unit may be regarded as a “hybrid suspension” in the sense that the magnetic forces are primarily applied in order to handle the transverse suspension forces, whereas a mechanical suspension forces primarily deal with vertical suspension, i.e. typically gravity induced force on the suspended structure.
  • Evidently, some suspension units may be applied for suspension based on magnetic attraction forces only if the magnetic attraction forces available are sufficient for the desired attachment.
  • When said mechanical fixation in at least one direction is established by mechanical fixation to fixation areas (31, 32), said fixation areas being arranged in substantially the vertical direction of a wind turbine tower, a further advantageous embodiment of the invention has been obtained.
  • According to the invention, wind turbine tower components may be mechanically suspended between the end point(s) of the turbine tower or wind turbine tower sections, thereby avoiding weakening of the wind turbine tower, which is typically caused by welding.
  • The magnetic attachment means may then form a supplement to the mechanical suspension in areas in which no mechanical attachment is desired or possible.
  • When said mechanical fixation in at least one direction is established by mechanical fixation to fixation areas (31, 32), said fixation areas being arranged at a certain distance from each other in the vertical direction of a wind turbine tower, said distances constituting approximately the vertical length of a wind turbine tower section (11, 12, 13, 14), a further advantageous embodiment of the invention has been obtained
  • When said fixation areas comprise flanges (131, 142) adapted to joining the wind turbine tower sections (11, 12, 13, 14), a further advantageous embodiment of the invention has been obtained.
  • According to the invention, the suspension method may be applied in more or less traditional wind towers or tower sections.
  • Moreover, the invention relates to a wind turbine tower suspension unit (20; 60), said wind turbine tower suspension unit (20; 60) comprising magnetic attachment means (24).
  • According to the invention, the wind turbine suspension unit may be attached to the wind turbine tower, preferably completely or partly to the inner wall by means of magnetic attraction forces.
  • A unit according to the invention may advantageously be applied for by attaching the interior of a wind turbine tower, such as a ladder, ladder parts, illumination means, lifts, platforms, power cables, etc.
  • According to the invention, improved suspension has been obtained since the desired attachment may be obtained by means of non-destructive attachment. In particular, the material properties of the tower or tower modules may remain substantially unaffected when attaching components or fittings to the surface of the tower.
  • Moreover, the amount of steel used for e.g. a tubular steel tower may be reduced significantly when avoiding or minimizing structure weakening joining process(es).
  • When said magnetic attachment means (24) are comprised by a permanent magnetic material, a further advantageous embodiment of the invention has been obtained.
  • According to a preferred embodiment, the permanent magnetic material comprises at least one anisotropic magnet.
  • When said permanent magnetic material comprises permanent Neodym magnets, a further advantageous embodiment of the invention has been obtained.
  • According to a preferred embodiment of the invention, Neodym magnets are applied due to the fact that they feature strong magnetic attraction compared to other available magnetic materials.
  • When said permanent magnetic material comprises permanent Samarium-Cobalt magnets, a further advantageous embodiment of the invention has been obtained.
  • When said wind turbine tower suspension unit (20; 60) comprises mechanical fixating means (22; 62), a further advantageous embodiment of the invention has been obtained.
  • According to the invention, the magnets applied should preferably feature a relatively high magnetic energy level and be resistant to demagnetizing, i.e. maintain the magnetic properties in different environments, both during mounting and during normal variations in e.g. temperature, humidity, etc.
  • Interior elements may then be attached to the mechanical fixation means by means of traditional attachment precautions.
  • When said wind turbine tower suspension unit (20) comprises at least one barrier (23) encapsulating said magnetic attachment means (24), a further advantageous embodiment of the invention has been obtained.
  • When said barrier (23) prevents transportation of humidity to the magnetic means (24), a further advantageous embodiment of the invention has been obtained.
  • According to the invention, degradation of especially the permanent magnetic material may be avoided simply by avoiding transportation of humidity into the magnet material.
  • When said barrier layer comprises rubber, a further advantageous embodiment of the invention has been obtained.
  • When said unit comprises means for receiving mechanical attraction forces in at least one first direction and means for establishment of magnetic attraction forces in at least one second direction, said at least one other direction being substantially transverse in relation to said at least one first direction, a further advantageous embodiment of the invention has been obtained.
  • When said unit comprises ladder fixating means, a further advantageous embodiment of the invention has been obtained.
  • When said unit comprises platform fixating means, a further advantageous embodiment of the invention has been obtained.
  • When said unit comprises cable fixating means, a further advantageous embodiment of the invention has been obtained.
  • When said unit comprises illumination means, a further advantageous embodiment of the invention has been obtained.
  • When said unit comprises mechanical fixtures for receipt of standard mechanical fastening means, a further advantageous embodiment of the invention has been obtained.
  • Moreover, the invention relates to a method of mounting suspension units whereby said units are attached to at least one wind turbine tower portion by means of computer-controlled positioning systems.
  • Moreover, the invention relates to a method of mounting suspension units whereby an electromagnetically generated magnetic field is applied for complete or partly temporary demagnetization of the suspension when the suspension unit is positioned at the attachment location.
  • Moreover, the invention relates to a method of de-attaching suspension units whereby an electromagnetically generated magnetic field is applied for complete or partly temporary demagnetization of the suspension unit, thereby facilitating de-attachment of the suspension unit by means of reduced de-attachment forces.
  • Moreover, the invention relates to a method of re-arranging suspension units whereby an electromagnetically generated magnetic field is applied for complete or partly temporary demagnetization of the suspension unit, thereby facilitating rearrangement of the suspension unit.
  • Moreover, the invention relates to a system of mutually attachable members, said system comprising at least one magnetic wind turbine tower portion, said system comprising at least one suspension unit (20;60), said at least one suspension unit (20;60) comprising at least one permanent magnetic portion (24), said at least one permanent magnetic portion (24) facilitating magnetic attachment of at least one suspension unit (20; 60) to said at least one magnetic wind turbine tower portion.
  • When said at least one magnetic wind turbine tower portion comprises a wind turbine tower (11, 12, 13, 14; 10), a further advantageous embodiment of the invention has been obtained.
  • When said wind turbine tower portion comprises a magnetic material of magnetic steel, a further advantageous embodiment of the invention has been obtained.
  • When said magnetic steel comprises steel S235 JR, JO, J2G3 or S 355 JO or J2G3, a further advantageous embodiment of the invention has been obtained.
  • Suspension unit comprising permanent magnet(s) according to the invention is suitable for fastening to the above-mentioned materials.
  • When said at least one permanent magnetic portion (24) comprises a Neodym magnetic material or Samarium-Cobalt magnetic material, a further advantageous embodiment of the invention has been obtained.
  • When said system comprises at least one suspension unit (20;60), a further advantageous embodiment of the invention has been obtained.
  • When said tower comprises at least two tower sections (11, 12, 13, 14), a further advantageous embodiment of the invention has been obtained.
  • When at least one of said tower sections is conical, a further advantageous embodiment of the invention has been obtained.
  • When at least one of said tower sections comprises mechanical attachment areas (131, 142) arranged in the upper and lower parts of said at least one tower section, a further advantageous embodiment of the invention has been obtained.
  • When at least one of said mechanical attachment areas (131, 142) facilitates mechanical attachment of at least one suspension unit (20; 60) and suspension to said at least one of said mechanical attachment areas (131, 142), a further advantageous embodiment of the invention has been obtained.
  • When at least two of said mechanical attachment areas (131, 142) facilitate mechanical attachment of at least one suspension unit (20; 60) and suspension between said at least two of said mechanical attachment areas (131, 142), a further advantageous embodiment of the invention has been obtained.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The invention will now be described in detail with reference to the drawings, in which
  • FIG. 1 a illustrates a wind turbine,
  • FIG. 1 b illustrates a wind turbine tower according to an embodiment of the invention,
  • FIG. 1 c illustrates a joining between two tower sections.
  • FIGS. 2 a and 2 b illustrate a suspension unit according to a preferred embodiment of the invention,
  • FIG. 3 illustrates fixation of a ladder within a wind turbine tower according to an embodiment of the invention.
  • FIG. 4 illustrates assembly of a suspension unit according to one embodiment of the invention and a fitting,
  • FIGS. 5 a and 5 b illustrate a further suspension unit according to the invention,
  • FIG. 6 illustrates the main force directions of an applicable attachment according to one embodiment of the invention, and
  • FIG. 7 illustrates the properties of permanent magnetic materials.
  • DETAILED DESCRIPTION OF THE INVENTION
  • Most large wind turbines are delivered with tubular steel towers manufactured in sections of 20-30 meters with flanges at both ends, and bolted together on the site. The towers are conical (i.e. the diameter increases towards the base) in order to increase strength and save materials at the same time.
  • The production costs of the wind turbine towers are relatively high compared with the manufacturing costs of the complete wind turbine construction. Moreover, these costs increase proportionately with the height and especially if it exceeds around fifty meters.
  • It is therefore quite important with respect to the final cost of energy to build towers as optimally as possible.
  • FIG. 1 a illustrates a typical wind turbine. The wind turbine comprises a tower 10 founded to the ground by means of a foundation. The tower 10 carries a nacelle 1 and a rotor 2.
  • Today, most modern wind turbine towers are conical tubular steel towers.
  • FIG. 1 b shows the cross section of such an exemplary tubular steel tower.
  • The illustrated wind turbine tower 10 comprises a number of conical tower sections 11, 12, 13 and 14. The length of the sections 11, 12, 13 and 14 are h1, h2, h3, h4, respectively.
  • The complete tower is conical and each of the sections 11, 12, 13 and 14 is conical and the upper diameter is d1 and the lower diameter is d4.
  • Hence, the towers may be assembled from these smaller, conical subsections 11, 12, 13 and 14 cut and molded into the right shape, and subsequently welded together.
  • The towers sections 11, 12, 13, 14 are usually manufactured in h1, h2, h3, h4=20 to 30 meter sections, the limiting factor being transportation on e.g. roads or by rail.
  • The illustrated tower sections 11, 12, 13, 14 have flanges 131, 142 at both ends, and may be bolted together on the site. The towers are conical (i.e. the diameter increases towards the base) in order to increase strength and save materials at the same time.
  • Typically, modern tower weights are 40 metric tonnes for a 50 m tower for a turbine with a 44 m rotor diameter (e.g. a 600 kW wind turbine), and 80 metric tonnes for a 60 metres tower for a 72 m rotor diameter (e.g. a 2000 kW wind turbine).
  • The illustrated tower may e.g. be an 80 (eighty) metric tonnes tower. The lower and upper diameters d4 and d1 may e.g. be approximately 4.2 meters and 2.3 meters, respectively.
  • It should be emphasized that the illustrated wind turbine tower and the illustrated choice of dimensions should in no way be regarded as restriction of the invention to the illustrated tower.
  • FIG. 1 c illustrates a detailed view of a joining of two sections 13, 14.
  • A lower flange 131 of the tower section 13 is bolted together with an upper flange 142 of the tower section 14. Evidently, the other sections may be joined in the same way.
  • The interior components of the above-described tower of FIG. 1 b may typically be comprised by platforms 1110, 1120, 1130, 1140, ladders 111, 112, 113 and 114 illumination means 121, 122, 123, power cables (not shown), lifts (not shown), etc (not shown).
  • The interior components are attached to the tower e.g. by means of suitable fittings attached to the inner surface of the tower.
  • The platforms 1110, 1120, 1130, 1140 may e.g. be suspended to attachment areas located near the assembly joints of the tower fittings, e.g. the upper and lower flanges of the tower sections 11, 12, 13, 14.
  • The platform may simply be attached to these joinings, e.g. flanges, by means of wires fixed to the platform at the lower end and to the flanges at the upper end. Thus, vertically, the platform is mechanically attached to the flange and hanging in the wires, whereas the platform comprises permanent magnetic suspension units providing magnetic fixation of the platform with respect to non-vertical excitation forces of the platform.
  • FIG. 2 a illustrates a wind turbine tower suspension unit 20 comprising a main body 21 and a mechanically connectable member or section 22 to which mechanical structures may be fixated by suitable fixation means.
  • The dimensions of the main body 21 of the illustrated unit may e.g. be approximately 200 mm×50 mm×25 mm and the weight may be approximately ½ kilogram.
  • FIG. 2 b shows a cross-section of the above-described wind turbine tower suspension unit 20.
  • The unit comprises a magnet 24 comprising one or a group of magnets. The magnet is a permanent magnet.
  • The characteristics of the magnet are described in detail below.
  • The magnet 24 is encapsulated by a barrier material 23 of e.g. rubber.
  • Advantageously, the barrier material should feature a relatively high friction coefficient, thereby maximizing the transversal conservative forces between the unit and the tower inner surface when the unit is attached to an inner surface by magnetic force in the usual direction.
  • The barrier material protects the magnet from humidity and dust, thereby preventing corrosion or other physical degradation of the magnet.
  • Moreover, a mechanically connectable member or section 22 is fastened to the main body of the unit. In this case, the magnet and the member or section 22 extend to the exterior of the unit and form a bolt, e.g. M10×30, at the end.
  • The bolt 22 may be fitted to a suitable nut, thereby providing fixation of a suitable fitting to the unit.
  • Please note that the lower part of the rubber sealing is quite thin in order to obtain the strongest possible attraction forces.
  • FIG. 2 c shows a further embodiment of the invention.
  • The illustrated suspension unit 200 comprises a U-shaped steel cover 250 arranged to be in galvanic contact with a permanent magnet 24, such as Neodym. The assembly has been formed with an upper sealing 230. The sealing is provided with a lip 231 adapted to engage with an underlying surface, thereby providing air-tight and water-proof enclosure around the magnet 24 once it is mounted.
  • The U-shape of the magnet provides an improved magnetic coupling to the underlying surface.
  • Evidently, other standard types of magnet configurations may be applied within the scope of the invention.
  • FIG. 2 d illustrates a further embodiment of the invention in which a suspension unit 200 comprises a magnet 24 arranged with a U-shaped magnetic conducting cover 250.
  • When the unit 200 has been magnetically attached to a surface 232, the entire assembly is subsequently covered by a suitable sealing means 231, e.g. tectyle, etc.
  • FIG. 3 illustrates an advantageous embodiment of the invention.
  • The figure illustrates a cross-section of the tower section 13 illustrated in FIG. 1 b. According to the illustrated embodiment, a ladder 113 is fixated to the inner surface 30 of the wind turbine tower section 13.
  • The ladder is suspended mechanically in two suspensions to the tower section, an upper mechanical suspension 31 and a lower mechanical suspension 32.
  • Bolting, welding, etc may e.g. obtain the suspension of the ladder to the tower.
  • Moreover the ladder is suspended in the tower by means of a number of wind turbine suspension units 20, e.g. illustrated in FIGS. 2 a and 2 b, or derivatives thereof.
  • The units 20 are attached to the inner surface by means of magnetic forces established by the magnets of the units 20, and the ladder may be attached to the units 20 e.g. by means of the fittings 22 of the units 20.
  • Basically, it may be appreciated that the main fixation in the vertical direction is obtained by means of mechanical end-point fixation to the tower, the upper flange 132 and lower flange 131 of the tower section 31, while the transverse fixation (i.e. the non-vertical) is obtained magnetically by means of the units 20.
  • According to the illustrated embodiment the vertical mechanical stress is primarily created by traditional mechanical attachment to the tower, e.g. by welding and/or bolting, while fixation of the ladder 31 is primarily obtained by magnetic fixation to the inner surface 30 of the tower section 13.
  • The distance between the suspension unit 20 in the vertical direction may e.g. be between 0.5 meter and 4 meters depending on the requirements to the fixation.
  • A preferred vertical distance is between 1.5 to 2.3. metres.
  • Evidently, a suspension unit according to the invention may be applied for fixation of several other interior components than the illustrated ladder.
  • According to a further embodiment of the invention, a ladder construction may e.g. be fixated to the tower by the above-described provisions and the further interior components such as lamps, power cables, etc. may then be fixated to the ladder construction itself by traditional attachment mechanics, welding, bolting etc.
  • FIG. 4 illustrates a further embodiment of the invention in which a tube 41 (e.g. of a ladder, a platform fitting, etc.) comprises a fitting 42 which is attached to a suspension unit 20 by means of a nut (not shown) fitted to the bolt 22 of the suspension unit.
  • The unit 20 may be magnetically attracted to an underlying surface, e.g. the above-described inner surface of a steel tower section wall, thereby establishing attachment by normal forces between the underlying surface and the tube 41.
  • Moreover, it should be noted that the fitting facilitates a degree of tolerance in the direction of the illustrated arrow between the fitting 42 and the bolt 22 of the suspension unit 20.
  • The freedom of tolerance provides a certain degree of tolerance when attaching the suspension units 20 to a tower in the manner suggested by the invention.
  • FIG. 5 a illustrates a further embodiment of the invention.
  • The illustrated suspension unit 60 comprises a main body 61 and two bolts 61.
  • Basically, the illustrated suspension unit 60 is constructed according to the principles outlined in the single-bolt version of the unit in FIG. 2 b.
  • FIG. 5 b illustrates the fitting of e.g. a steel bar 65 to the suspension unit 60.
  • The steel bar 65 is mechanically fixated to the suspension unit 60 by means of a suitable fitting 66 by means of nuts (not shown).
  • It should be noted that the illustrated assembly features a certain degree of tolerance in both the “vertical” and “horizontal” directions as illustrated by the arrows.
  • FIGS. 6 a and 6 b illustrate a method of mounting a suspension unit 60 according to the invention to a magnetic surface (not shown), e.g. a steel wind turbine tower.
  • Initially, in FIG. 6 a a suspension unit is arranged on e.g. a steel surface. A nylon sheet 65 is located between the underlying surface and the suspension unit 60. Due to the thickness of the sheet and the relatively low friction, the suspension unit 60 and the sheet 65 may be displaced relatively easily to the exact desired position.
  • In FIG. 6 b, the desired position has been reached, and the sheet 65 is removed, whereby stronger attachment forces have been obtained.
  • FIGS. 7 a and 7 b illustrate the main force directions FV and FN acting on a suspendible element 90 in an attachment according to one embodiment of the invention.
  • Vertical mechanical fixation ensures that the interior structure to be suspended is fixed in relation to the tower, at least with respect to gravity. These forces are primarily dealt with as vertical forces FV. Basically, the vertical forces should primarily be handled by traditional mechanical attachment so to speak.
  • Moreover, the magnetic suspension provides transverse fixation of the suspended element established by means of normal force FN acting in the illustrated transverse direction. This normal force FN may be exploited further, if friction members are applied between the suspension unit and the corresponding magnetic tower portion. Hence, according to well-known relationships between normal force FN and the frictions, transverse force is established to counteract e.g. rotational movements (tangential movement tm) of e.g. a platform or a ladder suspension.
  • FIG. 8 illustrates some of the properties of different permanent magnetic materials.
  • The illustrated diagram illustrates the behavior of six groups of magnetic materials, G1 to G6 at a temperature of approximately 20 degrees Celsius.
  • The x-axis represents HcJ (Coercivity [kA/m] and the y-axis represents maximum energy product |BH|max[kJ/m3]
  • |BH|max represents the energy potential of the material, whereas HcJ represents the material's ability to resist de-magnetizing fields.
  • Group G1 comprises so-called Neodym magnets, NdFeB. The Neodym magnets are some of the most powerful permanent magnets on the market.
  • Groups G2 and G3 comprise SmxCoy magnets characterized by a high degree of stability with respect to variation in temperature. Group G2 refers to Sm2Co17 and Group G3 refers to SmCo5.
  • Group G4 refers to a further group of so-called low HcSmxCoy magnets, Sm2Co17.
  • Group G5 comprises a group of plastic-bounded Neodym magnet material NdFeB.
  • Finally, group G6 comprises more traditional magnet materials such as Alnico and FeSr/FeBa materials.
  • Different magnetic materials may be applied in a suspension unit according to the invention.
  • According to a preferred embodiment of the invention, the applied permanent magnetic materials are primarily selected from materials featuring a high energy potential |BH|max. Hence, according to a preferred embodiment of the invention, the materials are chosen from group G1, i.e. the Neodym-magnets.
  • Evidently, if for instance temperature variations become critical, Samarium-Cobalt magnets may be preferred.
  • According to the invention, suspension units may e.g. be combined by units having magnets from different groups, thereby creating a degree of redundancy.

Claims (25)

1. A method of mounting elements in a wind turbine tower, comprising attaching said elements partly or completely to the wind turbine tower by means of magnetic attraction forces.
2. The method of mounting elements in a wind turbine tower according to claim 1, wherein said magnetic attraction forces are established by means of permanent magnetic materials interacting with other magnetic materials.
3. The method of mounting elements in a wind turbine tower according to claim 1, wherein said magnetic attraction forces are established by means of permanent magnetic materials being comprised in a suspension unit and interacting with other magnetic materials forming at least a portion of said wind turbine tower.
4. The method of mounting elements in a wind turbine tower according to claim 1, wherein said magnetic attraction forces are supplemented by mechanical fixation in at least one direction.
5. The method of mounting elements in a wind turbine tower according claim 4, wherein said mechanical fixation in at least one direction is established by mechanical fixation to fixation areas, said fixation areas being arranged at a certain distance from each other in the vertical direction of said wind turbine tower.
6. The method of mounting elements in a wind turbine tower according to claim 5, wherein said mechanical fixation in at least one direction is established by mechanical fixation to fixation areas, said fixation areas being arranged at a certain distance from each other in the vertical direction of said wind turbine tower, said distances approximately constituting the vertical length of a wind turbine tower section.
7. The method of mounting elements in a wind turbine tower according to claim 6, wherein said fixation areas comprise flanges adapted to joining the wind turbine tower sections.
8. A wind turbine tower suspension unit comprising a magnetic attachment means.
9. The wind turbine tower suspension unit according to claim 8, wherein said magnetic attachment means comprises a permanent magnetic material.
10. The wind turbine tower suspension unit according to claim 9, wherein said permanent magnetic material comprises permanent Neodym magnets.
11. The wind turbine tower suspension unit according to claim 10, wherein said permanent magnetic material comprises permanent Samarium-Cobalt magnets.
12. The wind turbine tower suspension unit according to claim 8, further comprising a mechanical fixating means.
13. The wind turbine tower suspension unit according to claim 8, further comprising at least one barrier encapsulating said magnetic attachment means completely or partly.
14. The wind turbine tower suspension unit according to claim 13, wherein said barrier prevents transportation of humidity to the magnetic attachment means.
15. The wind turbine tower suspension unit according to claim 8, further comprising a means for receiving mechanical attraction forces in at least one first direction and a means for establishment of magnetic attraction forces in at least one second direction, said at least one second direction being substantially transverse in relation to said at least one first direction.
16. A method of mounting a suspension unit comprising attaching said unit to at least one wind turbine tower portion by means of computer-controlled positioning systems.
17. A system of mutually attachable members, comprising at least one magnetic wind turbine tower portion, at least one suspension unit, said at least one suspension unit comprising at least one permanent magnetic portion, said at least one permanent magnetic portion facilitating magnetic attachment of at least one suspension unit to said at least one wind turbine tower portion.
18. The system according to claim 17, wherein said at least one magnetic wind turbine tower portion comprises a tower.
19. The system according to claim 17, wherein said wind turbine tower portion comprises a magnetic material of magnetic steel.
20. The system according to claim 17, wherein said at least one permanent magnetic portion comprises a Neodym magnetic material or Samarium-Cobalt magnetic material.
21. The system according to claim 17, wherein said at least one suspension unit comprising a magnetic attachment means.
22. The system according to claim 18, wherein said tower comprises at least two tower sections.
23. The system according to any of the claim 22, wherein at least one of said tower sections comprises mechanical attachment areas arranged in the upper and lower parts of said at least one tower section.
24. The system according to claim 23, wherein at least one of said mechanical attachment areas facilitates mechanical attachment of at least one suspension unit and suspension to said at least one of said mechanical attachment areas.
25. The system according to claim 23, wherein at least two of said mechanical attachment areas facilitate mechanical attachment of at least one suspension unit and suspension between said at least two of said mechanical attachment areas.
US11/932,576 2002-02-06 2007-10-31 Wind turbine tower suspension means Abandoned US20080145232A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US11/932,576 US20080145232A1 (en) 2002-02-06 2007-10-31 Wind turbine tower suspension means
US12/726,758 US8938931B2 (en) 2002-02-06 2010-03-18 Wind turbine tower suspension means
US13/167,379 US8567131B2 (en) 2002-02-06 2011-06-23 Wind turbine tower suspension means
US14/564,322 US9261081B2 (en) 2002-02-06 2014-12-09 Wind turbine tower suspension means

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
DK200200178A DK200200178A (en) 2002-02-06 2002-02-06 Wind turbine tower suspension means
DKPA200200178 2002-02-06
US10/157,286 US20030147753A1 (en) 2002-02-06 2002-05-29 Wind turbine tower suspension means
US11/932,576 US20080145232A1 (en) 2002-02-06 2007-10-31 Wind turbine tower suspension means

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US10/157,286 Continuation US20030147753A1 (en) 2002-02-06 2002-05-29 Wind turbine tower suspension means

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US12/726,758 Division US8938931B2 (en) 2002-02-06 2010-03-18 Wind turbine tower suspension means

Publications (1)

Publication Number Publication Date
US20080145232A1 true US20080145232A1 (en) 2008-06-19

Family

ID=27635722

Family Applications (5)

Application Number Title Priority Date Filing Date
US10/157,286 Abandoned US20030147753A1 (en) 2002-02-06 2002-05-29 Wind turbine tower suspension means
US11/932,576 Abandoned US20080145232A1 (en) 2002-02-06 2007-10-31 Wind turbine tower suspension means
US12/726,758 Active 2024-10-04 US8938931B2 (en) 2002-02-06 2010-03-18 Wind turbine tower suspension means
US13/167,379 Expired - Lifetime US8567131B2 (en) 2002-02-06 2011-06-23 Wind turbine tower suspension means
US14/564,322 Expired - Lifetime US9261081B2 (en) 2002-02-06 2014-12-09 Wind turbine tower suspension means

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US10/157,286 Abandoned US20030147753A1 (en) 2002-02-06 2002-05-29 Wind turbine tower suspension means

Family Applications After (3)

Application Number Title Priority Date Filing Date
US12/726,758 Active 2024-10-04 US8938931B2 (en) 2002-02-06 2010-03-18 Wind turbine tower suspension means
US13/167,379 Expired - Lifetime US8567131B2 (en) 2002-02-06 2011-06-23 Wind turbine tower suspension means
US14/564,322 Expired - Lifetime US9261081B2 (en) 2002-02-06 2014-12-09 Wind turbine tower suspension means

Country Status (14)

Country Link
US (5) US20030147753A1 (en)
EP (1) EP1472458B2 (en)
JP (1) JP2005517124A (en)
CN (1) CN1324235C (en)
AT (1) ATE293757T1 (en)
AU (1) AU2003214017B2 (en)
CA (1) CA2460021C (en)
DE (1) DE60300538T3 (en)
DK (2) DK200200178A (en)
ES (1) ES2242159T5 (en)
NO (1) NO333943B1 (en)
NZ (1) NZ531862A (en)
PL (1) PL208015B1 (en)
WO (1) WO2003067083A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070125037A1 (en) * 2005-11-18 2007-06-07 Karl-Heinz Meiners Segment for a tower of a wind energy turbine and method for arranging operating components of a wind energy turbine in a tower thereof
US20070245680A1 (en) * 2006-04-07 2007-10-25 General Electric Company Methods and apparatus for assembling wind turbine towers
US20080308696A1 (en) * 2005-11-24 2008-12-18 Jonas Kristensen Wind turbine tower, connection means for assembling a wind turbine tower and methods thereof
US20100058673A1 (en) * 2007-08-31 2010-03-11 Mitsubishi Heavy Industries Ltd Tubular-member flange coupling
US20100126079A1 (en) * 2008-11-27 2010-05-27 Vestas Wind Systems A/S Wind power plant and a method for assembling the same
US20100314884A1 (en) * 2007-12-21 2010-12-16 Vestas Wind Systems A/S Wind turbine, a method for reducing noise emission from a wind turbine tower and use of a wind turbine
US20120066998A1 (en) * 2010-09-21 2012-03-22 Fuji Jukogyo Kabushiki Kaisha Horizontal axis wind turbine
US8413405B2 (en) * 2008-12-19 2013-04-09 Repower Systems Se Tower of a wind power plant

Families Citing this family (79)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK200200178A (en) 2002-02-06 2003-08-07 Vestas Wind Sys As Wind turbine tower suspension means
US8146320B2 (en) * 2002-10-01 2012-04-03 General Electric Company Modular kit for a wind turbine tower
CN100337028C (en) 2003-05-09 2007-09-12 维斯塔斯风力系统有限公司 Wind turbine tower suspension arrangement
ES2347439T5 (en) * 2004-11-10 2018-10-04 Vestas Wind Systems A/S Tower part for a wind turbine, procedure for the manufacture of a tower part and uses thereof
CA2495596A1 (en) * 2005-02-07 2006-08-07 Resin Systems Inc. Method of modular pole construction and modular pole assembly
ES2283192B1 (en) * 2005-09-16 2008-09-16 GAMESA INNOVATION & TECHNOLOGY, S.L. METHOD OF ASSEMBLY OF ELEMENTS INSIDE THE TOWER OF AN AEROGENERATOR.
DE102005049288A1 (en) * 2005-10-14 2007-04-19 Zarges Aluminium Systeme Gmbh tower ladder
WO2007054098A1 (en) * 2005-11-14 2007-05-18 Lm Glasfiber A/S Wind power plant and method of controlling the blades in order to prevent tower strike
ES2696506T5 (en) 2006-06-29 2022-11-11 Vestas Wind Sys As A tower construction for a wind turbine
ES2326010B2 (en) * 2006-08-16 2011-02-18 Inneo21, S.L. STRUCTURE AND PROCEDURE FOR ASSEMBLING CONCRETE TOWERS FOR WIND TURBINES.
DE202006017158U1 (en) * 2006-11-08 2007-12-13 Greifzug Hebezeugbau Gmbh Steigleitersystem for tower elements for tower structures, in particular wind turbines and riser element for this purpose
EP2207943B1 (en) * 2007-10-09 2016-11-23 Jeffrey O. Willis Tower structure and method of assembling
US8763313B2 (en) * 2007-11-15 2014-07-01 General Electric Company Methods and systems for assembling a tower
US8316614B2 (en) * 2007-11-29 2012-11-27 Vestas Wind Systems A/S Method for establishing a wind turbine on a site
US20090167024A1 (en) * 2007-12-28 2009-07-02 Thorsten Landau Gluing of wind turbine internals to structural components
DE102008012664A1 (en) * 2008-01-30 2009-08-06 Repower Systems Ag Wind turbine and a tower or tower segment and a door frame for it
CN102099538B (en) * 2008-07-15 2013-08-14 西门子公司 Method for the assembly of a tower and tower
WO2010015507A2 (en) 2008-08-06 2010-02-11 Vestas Wind Systems A/S Adjustable suspension arrangement for wind turbine towers
CN101737273A (en) * 2008-11-17 2010-06-16 维斯塔斯风力系统集团公司 A tower, a wind turbine and a method for arranging a platform inside a tower
ES2373495B2 (en) * 2009-06-09 2012-09-25 Gamesa Innovation & Technology, S.L. METHOD AND SYSTEM FOR FIXING ELECTRIC CABLES.
US20100132269A1 (en) * 2009-06-15 2010-06-03 General Electric Company Rail-transportable wind turbine tower
US8201378B2 (en) * 2009-07-29 2012-06-19 General Electric Company Guide system for power modules
CN102597390B (en) * 2009-09-15 2015-01-21 安德森塔沃森有限公司 Tubular building structure with hingedly connected platform segment
ES2427741T3 (en) * 2009-11-02 2013-10-31 Vestas Wind Systems A/S A safety cover for a tower of a wind power installation
US8087898B2 (en) * 2009-12-15 2012-01-03 General Electric Company Stress relief flange and method for distributing stress for wind turbine components
DE102010008639A1 (en) 2010-02-15 2011-08-18 Spehr, Thorsten, 14548 Mounting construction for tower installation of wind turbines, has component structure, on which vertical load acts, where tensile forces acting on component structure are removed by bendable traction elements
JP5349411B2 (en) * 2010-06-24 2013-11-20 櫻井技研工業株式会社 Maintenance method for wind turbine blades of wind power generation equipment
WO2012025985A1 (en) * 2010-08-24 2012-03-01 三菱重工業株式会社 Wind turbine device and method for constructing tower for blade wheel
US9677543B2 (en) * 2010-11-01 2017-06-13 Mitsubishi Heavy Industries, Ltd. Structure for nacelle cover connection portion of wind turbine generator
US20110140447A1 (en) * 2010-11-10 2011-06-16 Ingo Paura Reinforcement assembly for use with a support tower of a wind turbine
US8209913B2 (en) * 2011-02-01 2012-07-03 Mitsubishi Heavy Industries, Ltd. Tubular structure and wind turbine generator
DK2574779T3 (en) * 2011-09-30 2016-08-15 Siemens Ag Device for attaching a component to a wind turbine
EP2574780A1 (en) 2011-09-30 2013-04-03 Siemens Aktiengesellschaft Arrangement for fixing a component inside of a wind turbine
JP5536197B2 (en) * 2011-11-04 2014-07-02 三菱重工業株式会社 Tower interior bracket structure and wind power generator
CA146229S (en) * 2011-12-28 2014-07-14 Iat 21 Innovative Aeronautics Technologies Gmbh Wind turbine
US9057205B2 (en) 2012-01-06 2015-06-16 General Electric Company Platform assembly for a wind turbine tower
EP2620644B1 (en) * 2012-01-30 2015-06-17 Siemens Aktiengesellschaft Improvements to a wind turbine assembly
DK2653715T3 (en) * 2012-04-19 2016-08-01 Nordex Energy Gmbh Tower for a wind power plant and method of raising it
US20130299277A1 (en) * 2012-05-11 2013-11-14 Clipper Windpower, Inc. Optimized Wind Turbine Tower with Mountings for Tower Internals
CN102678480B (en) * 2012-05-16 2014-05-28 广东明阳风电产业集团有限公司 Tower frame of wind turbine generator set
EP2859228B1 (en) * 2012-06-07 2019-02-27 Vestas Wind Systems A/S Tower cable arrangements for wind turbines
CA2880788C (en) * 2012-08-03 2020-03-24 James D. Lockwood Precast concrete post tensioned segmented wind turbine tower
US8839586B2 (en) 2012-09-14 2014-09-23 General Electric Company Tower section and method for installing tower for wind turbine
EP2895741A1 (en) 2012-09-17 2015-07-22 Vestas Wind Systems A/S Method of damping wind turbine tower oscillations
DE102012109860A1 (en) * 2012-10-16 2014-04-17 Max Bögl Wind AG Supply tower for a tower, tower with a utility scaffold and method for erecting a utility scaffolding inside a tower
DE202012009889U1 (en) 2012-10-17 2012-12-10 E.N.O. Energy Systems Gmbh Component mounting in a tower of a wind turbine
EP2920455B1 (en) * 2012-11-15 2018-08-22 Vestas Wind Systems A/S Method and device for aligning tower sections
ES2471641B1 (en) * 2012-12-21 2015-04-07 Acciona Windpower, S.A. Prefabricated concrete dovela, wind turbine tower comprising said dovela, wind turbine comprising said tower and assembly procedure of said wind turbine
WO2014122767A1 (en) * 2013-02-08 2014-08-14 三菱重工業株式会社 Tower for wind-power generating device
DE202013005197U1 (en) 2013-06-07 2013-08-23 E.N.O. Energy Systems Gmbh Mounting construction for installation elements in a tower of a wind energy plant
DE102013211750A1 (en) * 2013-06-21 2014-12-24 Wobben Properties Gmbh Wind turbine and wind turbine foundation
US20150027068A1 (en) * 2013-07-24 2015-01-29 General Electric Company Tower base assembly for a wind turbine
DE102013217088A1 (en) * 2013-08-27 2015-03-05 Senvion Se Method for assembling tower installations
DK2884095T3 (en) * 2013-12-12 2016-11-28 Siemens Ag Adjusted liquid damper of a wind turbine
ES2538734B1 (en) * 2013-12-20 2016-05-10 Acciona Windpower, S.A. Assembly procedure of concrete towers with a truncated cone section and a concrete tower mounted with said procedure
CN103711654B (en) * 2013-12-23 2016-07-06 江苏海力风电设备科技有限公司 A kind of tower is internally integrated girder device and installation method thereof
EP2889471B1 (en) 2013-12-30 2021-10-20 Siemens Gamesa Renewable Energy A/S Damping arrangement
CN106460795A (en) * 2014-04-22 2017-02-22 维斯塔斯风力系统有限公司 Method and tool for assembling tower elements
US9487960B2 (en) 2014-06-17 2016-11-08 One Energy Enterprises Llc Suspended deck systems, kits, and methods of installing, inspecting, and repairing a suspended deck system
FR3029231B1 (en) * 2014-12-01 2016-12-30 Lafarge Sa CONCRETE SECTION
ES2751757T3 (en) 2015-03-13 2020-04-01 Ge Renewable Tech Wind Bv Safety structure to carry out maintenance operations on a wind turbine and procedure for its installation
US10888084B2 (en) 2015-07-15 2021-01-12 Nrg Systems, Inc. Ultrasonic bat deterrent system
US10260284B2 (en) * 2015-08-31 2019-04-16 Wind Tower Technologies, Inc. Ladder installation for equipment tower
ES2606786B1 (en) * 2015-09-23 2018-01-31 Esteyco S.A.P. GUIDE DEVICE FOR WINDOW TOWER ASSEMBLY
US10047725B2 (en) * 2015-10-12 2018-08-14 General Electric Company Ladder attachment system for a wind turbine
WO2017079435A1 (en) 2015-11-03 2017-05-11 Nrg Systems, Inc. Techniques for providing a broad-band ultrasonic transducer device using a plurality of narrow-band transducer arrays and a method of wildlife deterrence using same
US9822537B2 (en) 2015-11-04 2017-11-21 Inventus Holdings, Llc Personnel safety shield and system
USD795465S1 (en) * 2016-02-16 2017-08-22 Sociedade Portuguesa Cavan, S.A. Utility pole
DE202016101425U1 (en) 2016-03-15 2016-05-02 Nordex Energy Gmbh Arrangement for attaching components to a metallic wall of a tower of a wind turbine, tower of a wind turbine and wind turbine
DK3548680T3 (en) * 2017-01-10 2023-07-10 Keystone Tower Systems Inc WIND TURBINE TOWER ATTACHMENT
US11286915B2 (en) * 2017-01-18 2022-03-29 Siemens Gamesa Renewable Energy A/S Standardized platform arrangement of a wind turbine
CN110709566B (en) * 2017-06-09 2021-04-16 维斯塔斯风力系统有限公司 Suspension device for attaching a component to a wall of a wind turbine tower
DE102017125716A1 (en) * 2017-11-03 2019-05-09 Eno Energy Systems Gmbh Method for erecting a tower with a multi-part tower section and sub-section of a multi-part tower section of a tower
DE202018102433U1 (en) 2018-05-02 2019-08-06 Nordex Energy Gmbh Support system for platforms in a tower of a wind turbine and tower with such a support system
CN108506169A (en) * 2018-05-16 2018-09-07 中国电建集团华东勘测设计研究院有限公司 A kind of Wind turbines prestressing force stay-supported pylon increases method and structure
CN110374817B (en) * 2019-08-16 2021-01-26 太原重工股份有限公司 Wind generating set tower barrel without additional welding part
EP3869032B1 (en) * 2020-02-20 2024-04-10 Siemens Gamesa Renewable Energy Innovation & Technology, S.L. Seal for a wind turbine nacelle
CN112283048B (en) * 2020-10-28 2022-03-08 西安热工研究院有限公司 Wind turbine generator blade clearance detection method and device
USD950491S1 (en) * 2021-02-05 2022-05-03 Charles Bryan Tower with wind or water rotor generators

Citations (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2727650A (en) * 1954-12-15 1955-12-20 Thomas F Moynihan Magnetic seal for leaks in oil tanks and the like
US2890848A (en) * 1957-06-25 1959-06-16 Jr Robert A Johnson Magnetized clamp for conduit
US2939671A (en) * 1958-11-13 1960-06-07 Robert L Beekman Magnetic holder
US2977082A (en) * 1960-08-01 1961-03-28 Arthur L Harris Magnetic support
US3051875A (en) * 1959-04-13 1962-08-28 Warren B Farwell Magnetic block
US3100275A (en) * 1961-12-08 1963-08-06 Emmett J Gantz Magnetic tool holder
US3109619A (en) * 1958-12-29 1963-11-05 Krug Martin Supporting means and method for toothbrushes and the like
US3230653A (en) * 1963-10-31 1966-01-25 Don Roddy Inc Vehicle license plate holder
US3239179A (en) * 1962-04-19 1966-03-08 Jiffy Entpr Inc Wall and ceiling hanger
US3556248A (en) * 1969-06-13 1971-01-19 Adolphas E Brown Folding ladder for a working cart
US3924117A (en) * 1974-09-26 1975-12-02 Union Carbide Corp Flashlight having a magnet-switch combination
US4026086A (en) * 1975-07-18 1977-05-31 Langley David T Building brick
US4272929A (en) * 1979-08-23 1981-06-16 Hanson Bror H Tower and method of construction
US4565929A (en) * 1983-09-29 1986-01-21 The Boeing Company Wind powered system for generating electricity
US4601754A (en) * 1984-03-30 1986-07-22 Union Oil Company Of California Rare earth-containing magnets
US5192155A (en) * 1992-04-20 1993-03-09 The United States Of America As Represented By The United States Department Of Energy Magnetic gripper device
US5411231A (en) * 1993-12-14 1995-05-02 Buck; Richard F. Magnetic attachment means of non-magnetic accessories to metal doors
US5710567A (en) * 1995-10-25 1998-01-20 Allgon Ab Antenna locking device using magnetic attractive elements when antenna is extended
US5746329A (en) * 1995-08-28 1998-05-05 Northrop Grumman Corporation Hanger system
US5816548A (en) * 1997-04-14 1998-10-06 Blossom Iii; John T. Vase with attached magnet
US6051875A (en) * 1997-08-20 2000-04-18 Micron Technology, Inc. Semiconductor chip
US20010004819A1 (en) * 1999-12-01 2001-06-28 Wolfgang Reymann Formwork for prefabricated concrete parts
US20020012582A1 (en) * 1998-12-17 2002-01-31 Karsten Kirkegaard Wind mill with a suspension for cables and the like, such suspension for cables and the like and a holder for such suspension
US20020025220A1 (en) * 2000-08-23 2002-02-28 Yoji Okuda Magnet mounting structure
US20020070079A1 (en) * 2000-07-14 2002-06-13 Rosenwinkel Richard A. Portable segmented ladder chute
US20020151824A1 (en) * 2000-04-13 2002-10-17 Peter Fischer Posture measurment and feedback instrument for seated occupations
US6470645B1 (en) * 2000-11-09 2002-10-29 Beaird Industries, Inc. Method for making and erecting a wind tower
US20020175251A1 (en) * 2001-05-22 2002-11-28 Robinson Christopher J. Sensor mount attachment device
US20030147753A1 (en) * 2002-02-06 2003-08-07 Borge Ollgaard Wind turbine tower suspension means

Family Cites Families (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE7435436U (en) 1975-03-13 Wirtz M Flat conductor
US415324A (en) * 1889-11-19 Pole for electric wires
US2011018A (en) 1934-06-18 1935-08-13 Harold E Smith Chimney construction
US3095060A (en) * 1961-06-28 1963-06-25 Baker Roos Inc Scaffolding for dome structures
DE1924864U (en) 1965-07-27 1965-10-07 Walter Wilhelms MAGNETIC LAMP.
DE6916240U (en) 1969-04-21 1969-10-02 Meino Ackermann ELECTRO-MAGNETIC SHIP LADDER
DE1924864A1 (en) 1969-05-16 1970-11-19 Licentia Gmbh Printed circuit manufacture using laminates - containing catalyst for non electrolytic
DE6930311U (en) 1969-07-25 1969-12-04 Calor Emag Elektrizitaets Ag WARNING SIGN FOR SWITCHGEAR
US3768016A (en) * 1972-06-01 1973-10-23 Pittsburgh Des Moines Steel Modular, prefabricated, integrated communications relay tower
US3960242A (en) * 1972-12-01 1976-06-01 Whiting Corporation Orbital service bridge
DE2400313C3 (en) * 1974-01-04 1979-04-26 Fried. Krupp Gmbh, 4300 Essen Auxiliary equipment for assembly and maintenance work on a cooling tower
JPS5815714B2 (en) 1980-05-02 1983-03-26 滝川工業株式会社 Scrap charging method
US4483033A (en) * 1982-12-21 1984-11-20 The Singer Company Service device for the interior viewing surface of a simulator dome
US4966525A (en) * 1988-02-01 1990-10-30 Erik Nielsen Yawing device and method of controlling it
GB8926019D0 (en) 1989-11-17 1990-01-10 Steele James H D Magnetic retainer
US5333436A (en) * 1992-09-14 1994-08-02 Pirod, Inc. Modular antenna pole
JPH0747525A (en) 1993-08-06 1995-02-21 Nippon Steel Corp Production of extrusion molded object composed of ceramic material
FR2709805B1 (en) 1993-09-06 1995-11-17 Michel Wahl Set of wedge supports.
SE503948C2 (en) * 1993-12-15 1996-10-07 Mafi Ab Mast
JPH07201201A (en) 1993-12-28 1995-08-04 Takubo Kogyosho:Kk Lighting device
JP3199223B2 (en) 1995-10-03 2001-08-13 日立金属株式会社 Magnetic suspension device and suspension support method for pipeline
US6071077A (en) 1996-04-09 2000-06-06 Rolls-Royce Plc Swept fan blade
JP2869636B2 (en) 1996-06-24 1999-03-10 和弘 大日向 Ladder fixture
DE19702956A1 (en) 1997-01-28 1998-07-30 Sven Kellner Shell for clamping cables to metal surfaces
JPH11322234A (en) 1998-05-14 1999-11-24 Toshiba Elevator Co Ltd Panel mounting method to side plate of elevator car and elevator car
JPH11318580A (en) 1998-05-15 1999-11-24 Dyflex:Kk Desk-top manuscript holder
KR100288245B1 (en) * 1998-07-24 2001-05-02 정형 Apparatus for automatically switching absorptive magnetic force
JP2000158250A (en) 1998-11-20 2000-06-13 Kumagai Gumi Co Ltd Assembling method of connecting member to steel pipe pillar and device thereof
JP2001069647A (en) 1999-08-31 2001-03-16 Matsushita Electric Works Ltd Cable-holding fixture
JP2001122057A (en) 1999-10-28 2001-05-08 Auto Network Gijutsu Kenkyusho:Kk Vehicle body fixing structure for wire harness
DE10004246A1 (en) 2000-02-01 2001-08-23 Robert Forsler Device for fixing notices to surfaces comprises carrier which is attached to a suction cup or magnetic fasteners and has cork or foam plastic board on other side
DE20003341U1 (en) 2000-02-24 2000-06-21 Spittel Wolfgang Universal, displaceable holder / holder for ladders
US6640928B1 (en) 2000-02-29 2003-11-04 Hal J. Ridley, Jr. Free-standing, multi-functional, mobile construction aid
DE20012599U1 (en) 2000-07-18 2000-11-30 Breuer Gerlinde Magnetic holder
US6467233B1 (en) * 2000-11-09 2002-10-22 Beaird Industries, Inc Wind tower
AU2002225600A1 (en) * 2000-11-09 2002-05-21 Beaird Industries, Inc. Wind tower with ladders and platforms
DE10144206A1 (en) 2001-09-08 2003-04-10 Jakob Triebel Illumination system for suspended ceilings has panels of four sheets, two of steel plate to conduct current to supply lamps, lamp holder with magnetic contacts to hold lamps on ceiling
ES2196977B1 (en) 2001-10-26 2005-03-01 Saul Diez Valbuena STATIC-MULTIPLE SUSPENDED ANDAMIAJE SYSTEM.
HUP0201136A2 (en) 2002-04-03 2004-04-28 Meir Silber A lattice tower disquised as a monopole
JP3592313B2 (en) 2002-05-10 2004-11-24 大王製紙株式会社 Internal wall work equipment for tower tank
CN100337028C (en) 2003-05-09 2007-09-12 维斯塔斯风力系统有限公司 Wind turbine tower suspension arrangement
US20050224288A1 (en) 2004-04-13 2005-10-13 Chesness Curtis J Wildlife observation stand
US20060131107A1 (en) 2004-12-17 2006-06-22 Structure D'acier Orleans Inc. Suspended cable scaffold assembly
ES2283192B1 (en) 2005-09-16 2008-09-16 GAMESA INNOVATION & TECHNOLOGY, S.L. METHOD OF ASSEMBLY OF ELEMENTS INSIDE THE TOWER OF AN AEROGENERATOR.
US7762037B2 (en) 2005-11-18 2010-07-27 General Electric Company Segment for a tower of a wind energy turbine and method for arranging operating components of a wind energy turbine in a tower thereof
EP1974112B1 (en) 2006-01-17 2012-10-24 Vestas Wind Systems A/S A wind turbine tower, a wind turbine, a wind turbine tower elevator and a method for assembling a wind turbine tower
ES2288401B1 (en) 2006-03-28 2009-05-01 GAMESA INNOVATION & TECHNOLOGY S.L. LIFTING EQUIPMENT FOR THE ASSEMBLY OF AN AIRBRUSHER.
ES2685834T3 (en) 2006-06-30 2018-10-11 Vestas Wind Systems A/S A wind turbine tower and method to alter the proper frequency of a wind turbine tower
DE202006017158U1 (en) 2006-11-08 2007-12-13 Greifzug Hebezeugbau Gmbh Steigleitersystem for tower elements for tower structures, in particular wind turbines and riser element for this purpose
WO2009056898A1 (en) 2007-11-02 2009-05-07 Alejandro Cortina-Cordero Post-tensioned concrete tower for wind turbines
ES2366141T3 (en) * 2007-11-28 2011-10-17 Vestas Wind Systems A/S PROCEDURE TO CUSH THE SWINGS OF A WIND TURBINE.
US20090223139A1 (en) 2008-03-05 2009-09-10 Karl-Heinz Meiners Method and system for assembling components in a tower of a wind energy turbine
CN101737273A (en) 2008-11-17 2010-06-16 维斯塔斯风力系统集团公司 A tower, a wind turbine and a method for arranging a platform inside a tower
ES2378199B1 (en) 2009-06-24 2013-06-05 Acciona Windpower S.A. SYSTEM OF UNION OF A GONDOLA WITH THE TOWER OF CONCRETE OF AN AEROGENERATOR.

Patent Citations (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2727650A (en) * 1954-12-15 1955-12-20 Thomas F Moynihan Magnetic seal for leaks in oil tanks and the like
US2890848A (en) * 1957-06-25 1959-06-16 Jr Robert A Johnson Magnetized clamp for conduit
US2939671A (en) * 1958-11-13 1960-06-07 Robert L Beekman Magnetic holder
US3109619A (en) * 1958-12-29 1963-11-05 Krug Martin Supporting means and method for toothbrushes and the like
US3051875A (en) * 1959-04-13 1962-08-28 Warren B Farwell Magnetic block
US2977082A (en) * 1960-08-01 1961-03-28 Arthur L Harris Magnetic support
US3100275A (en) * 1961-12-08 1963-08-06 Emmett J Gantz Magnetic tool holder
US3239179A (en) * 1962-04-19 1966-03-08 Jiffy Entpr Inc Wall and ceiling hanger
US3230653A (en) * 1963-10-31 1966-01-25 Don Roddy Inc Vehicle license plate holder
US3556248A (en) * 1969-06-13 1971-01-19 Adolphas E Brown Folding ladder for a working cart
US3924117A (en) * 1974-09-26 1975-12-02 Union Carbide Corp Flashlight having a magnet-switch combination
US4026086A (en) * 1975-07-18 1977-05-31 Langley David T Building brick
US4272929A (en) * 1979-08-23 1981-06-16 Hanson Bror H Tower and method of construction
US4565929A (en) * 1983-09-29 1986-01-21 The Boeing Company Wind powered system for generating electricity
US4601754A (en) * 1984-03-30 1986-07-22 Union Oil Company Of California Rare earth-containing magnets
US5192155A (en) * 1992-04-20 1993-03-09 The United States Of America As Represented By The United States Department Of Energy Magnetic gripper device
US5411231A (en) * 1993-12-14 1995-05-02 Buck; Richard F. Magnetic attachment means of non-magnetic accessories to metal doors
US5746329A (en) * 1995-08-28 1998-05-05 Northrop Grumman Corporation Hanger system
US5710567A (en) * 1995-10-25 1998-01-20 Allgon Ab Antenna locking device using magnetic attractive elements when antenna is extended
US5816548A (en) * 1997-04-14 1998-10-06 Blossom Iii; John T. Vase with attached magnet
US6051875A (en) * 1997-08-20 2000-04-18 Micron Technology, Inc. Semiconductor chip
US20020012582A1 (en) * 1998-12-17 2002-01-31 Karsten Kirkegaard Wind mill with a suspension for cables and the like, such suspension for cables and the like and a holder for such suspension
US20010004819A1 (en) * 1999-12-01 2001-06-28 Wolfgang Reymann Formwork for prefabricated concrete parts
US20020151824A1 (en) * 2000-04-13 2002-10-17 Peter Fischer Posture measurment and feedback instrument for seated occupations
US20020070079A1 (en) * 2000-07-14 2002-06-13 Rosenwinkel Richard A. Portable segmented ladder chute
US20020025220A1 (en) * 2000-08-23 2002-02-28 Yoji Okuda Magnet mounting structure
US6470645B1 (en) * 2000-11-09 2002-10-29 Beaird Industries, Inc. Method for making and erecting a wind tower
US20020175251A1 (en) * 2001-05-22 2002-11-28 Robinson Christopher J. Sensor mount attachment device
US20030147753A1 (en) * 2002-02-06 2003-08-07 Borge Ollgaard Wind turbine tower suspension means

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070125037A1 (en) * 2005-11-18 2007-06-07 Karl-Heinz Meiners Segment for a tower of a wind energy turbine and method for arranging operating components of a wind energy turbine in a tower thereof
US7762037B2 (en) * 2005-11-18 2010-07-27 General Electric Company Segment for a tower of a wind energy turbine and method for arranging operating components of a wind energy turbine in a tower thereof
US20080308696A1 (en) * 2005-11-24 2008-12-18 Jonas Kristensen Wind turbine tower, connection means for assembling a wind turbine tower and methods thereof
US8225576B2 (en) 2005-11-24 2012-07-24 Vestas Wind Systems A/S Wind turbine tower, connection means for assembling a wind turbine tower and methods thereof
US20070245680A1 (en) * 2006-04-07 2007-10-25 General Electric Company Methods and apparatus for assembling wind turbine towers
US8056296B2 (en) * 2006-04-07 2011-11-15 General Electric Company Methods and apparatus for assembling wind turbine towers
US20100058673A1 (en) * 2007-08-31 2010-03-11 Mitsubishi Heavy Industries Ltd Tubular-member flange coupling
US20100314884A1 (en) * 2007-12-21 2010-12-16 Vestas Wind Systems A/S Wind turbine, a method for reducing noise emission from a wind turbine tower and use of a wind turbine
US8878377B2 (en) * 2007-12-21 2014-11-04 Vestas Wind Systems A/S Wind turbine, a method for reducing noise emission from a wind turbine tower and use of a wind turbine
US20100126079A1 (en) * 2008-11-27 2010-05-27 Vestas Wind Systems A/S Wind power plant and a method for assembling the same
US8413405B2 (en) * 2008-12-19 2013-04-09 Repower Systems Se Tower of a wind power plant
US20120066998A1 (en) * 2010-09-21 2012-03-22 Fuji Jukogyo Kabushiki Kaisha Horizontal axis wind turbine

Also Published As

Publication number Publication date
US20110252738A1 (en) 2011-10-20
CN1556898A (en) 2004-12-22
JP2005517124A (en) 2005-06-09
AU2003214017B2 (en) 2006-04-06
CN1324235C (en) 2007-07-04
AU2003214017A1 (en) 2003-09-02
EP1472458B1 (en) 2005-04-20
PL208015B1 (en) 2011-03-31
ATE293757T1 (en) 2005-05-15
US20030147753A1 (en) 2003-08-07
US20150159634A1 (en) 2015-06-11
DE60300538T3 (en) 2013-04-11
ES2242159T3 (en) 2005-11-01
PL370912A1 (en) 2005-05-30
EP1472458B2 (en) 2012-11-21
CA2460021A1 (en) 2003-08-14
NZ531862A (en) 2005-09-30
EP1472458A1 (en) 2004-11-03
DK1472458T4 (en) 2013-03-11
NO20042384L (en) 2004-06-08
US8938931B2 (en) 2015-01-27
WO2003067083A1 (en) 2003-08-14
ES2242159T5 (en) 2013-04-03
DE60300538T2 (en) 2006-02-23
DK1472458T3 (en) 2005-08-01
US20100186342A1 (en) 2010-07-29
NO333943B1 (en) 2013-10-28
CA2460021C (en) 2009-10-06
US8567131B2 (en) 2013-10-29
US9261081B2 (en) 2016-02-16
DE60300538D1 (en) 2005-05-25
DK200200178A (en) 2003-08-07

Similar Documents

Publication Publication Date Title
US9261081B2 (en) Wind turbine tower suspension means
US7735289B2 (en) Wind turbine tower suspension arrangement
US6470645B1 (en) Method for making and erecting a wind tower
US8250833B2 (en) Wind turbine tower and method for constructing a wind turbine tower
EP2444663A2 (en) Onshore wind turbine with tower support system
EP2194265A2 (en) Wind turbine with improved tower and method of assembling same
WO2005028781A2 (en) Composite tower for a wind turbine and method of assembly
KR20110068332A (en) Tower module of a wind power generation
AU2009243464A1 (en) Method and system for coupling a stair platform to a tower of a wind energy turbine
US20210355916A1 (en) Tower section arrangement for a guyed tower of a wind turbine, guyed wind turbine tower, wind turbine and method for assembling a wind turbine
KR102033525B1 (en) Airbreak indicator installation unit of wind turbine generator and its method
EP3916220A1 (en) Tower arrangement for a wind turbine, wind turbine comprising the tower arrangement and method for erecting a wind turbine
CN219491881U (en) High-rigidity composite material heightening frame
CN210768055U (en) Connecting hardware fitting, composite cross arm and door-shaped tower
JP2022189030A (en) Facility device attachment structure
JP2018016302A (en) Offshore wind power generation facility and installation method of the same

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation