DE10232423A1 - Verfahren zum Betreiben einer Windenergieanlage und Windenergieanlage zum Ausführen derartiger Verfahren - Google Patents
Verfahren zum Betreiben einer Windenergieanlage und Windenergieanlage zum Ausführen derartiger Verfahren Download PDFInfo
- Publication number
- DE10232423A1 DE10232423A1 DE10232423A DE10232423A DE10232423A1 DE 10232423 A1 DE10232423 A1 DE 10232423A1 DE 10232423 A DE10232423 A DE 10232423A DE 10232423 A DE10232423 A DE 10232423A DE 10232423 A1 DE10232423 A1 DE 10232423A1
- Authority
- DE
- Germany
- Prior art keywords
- rotor
- windings
- converter
- currents
- wind energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02P—CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- H02P9/00—Arrangements for controlling electric generators for the purpose of obtaining a desired output
- H02P9/42—Arrangements for controlling electric generators for the purpose of obtaining a desired output to obtain desired frequency without varying speed of the generator
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02P—CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- H02P9/00—Arrangements for controlling electric generators for the purpose of obtaining a desired output
- H02P9/007—Control circuits for doubly fed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02P—CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- H02P2101/00—Special adaptation of control arrangements for generators
- H02P2101/15—Special adaptation of control arrangements for generators for wind-driven turbines
Abstract
Die Erfindung betrifft ein Verfahren zum Betreiben einer Windenergieanlage, bei dem von einer Einspeisungseinrichtung mit Läuferströmen gespeiste Läuferwicklungen eines an ein Spannungsnetz gekoppelte Ständerwicklungen aufweisenden Asynchrongenerators mit einem Rotor der Windenergieanlage angetrieben werden, die Frequenzen der eingespeisten Läuferströme in Abhängigkeit von der Läufer-Drehfrequenz gesteuert und die Einspeisungseinrichtung bei vorgegebenen Änderungen der Netzspannungsamplituden elektrisch von den Läuferwicklungen entkoppelt wird und bei dem die Läuferstromeinspeisung nach der durch die Änderung der Netzspannungsamplitude verursachten Entkopplung wieder aufgenommen wird, sobald die durch diese Änderung in den Läuferwicklungen erzeugten Ströme auf einen vorgebenen Wert abgefallen sind.
Description
- Die Erfindung betrifft ein Verfahren zum Betreiben einer Windenergieanlage, bei dem von einer Einspeisungseinrichtung mit Läuferströmen gespeiste Läuferwicklungen eines an ein Spannungsnetz gekoppelte Ständerwicklungen aufweisenden Asynchrongenerators mit einem Rotor der Windenergieanlage angetrieben werden, die Frequenzen der eingespeisten Läuferströme in Abhängigkeit von der Läufer-Drehfrequenz gesteuert und die Einspeisungseinrichtung bei vorgegebenen Änderungen der Netzspannungsamplituden elektrisch von den Läuferwicklungen entkoppelt wird sowie eine zur Ausführung derartiger Verfahren betreibbare Windenergieanlage.
- Windenergieanlagen sind extremen, kurzfristigen Schwankungen des Angebots an Primärenergie durch Windböen unterworfen. Aus diesem Grund werden zur Erzeugung elektrischer Energie mit Hilfe von Windenergieanlagen üblicherweise Generatoren mit variabler Drehzahl eingesetzt, weil die Energie von Windböen bei Verwendung derartiger Generatoren nicht unmittelbar in das Netz eingeleitet, sondern durch Drehzahländerungen in den Schwungmassen der Windenergieanlage gespeichert werden kann. Auf diese Weise können die mechanischen Belastungen der Windenergieanlage im Vergleich zu Anlagen mit starrer Drehzahl deutlich reduziert und die mechanischen Teile entsprechend leichter und kostengünstiger ausgeführt werden. Als Generatoren mit variabler Drehzahl werden üblicherweise Asynchrongeneratoren eingesetzt, deren Ständerwicklungen direkt an das Spannungsnetz gekoppelt sind und deren Läuferwicklungen von dem Rotor der Windenergieanlage angetrieben und mit Hilfe geeigneter Umrichter mit Läuferströmen gespeist werden. Dabei werden die Frequenzen der eingespeisten Läuferströme so gesteuert, daß die Summe aus Läuferdrehfrequenz und Läuferstromfrequenz immer gleich der Netzfrequenz ist. Zur Speisung der Läuferwicklungen können sowohl an das Netz gekoppelte Direktumrichter als auch Spannungszwischenkreis-Umrichter mit einem netzseitigen Netzumrichter und einem über einen induktiven und/oder kapazitiven Blindwiderstand daran gekoppelten Rotorstromrichter eingesetzt werden.
- Sowohl beim Einsatz von Direktumrichtern als auch beim Einsatz von Spannungszwischenkreis-Umrichtern tritt das Problem auf, daß beispielsweise bei durch Kurzschlüsse im Netz verursachten Änderungen der Netzspannungsamplituden große Spannungsunterschiede zwischen Netz und Ständerwicklungen auftreten, welche wiederum einen starken Stromanstieg der direkt an das Netz gekoppelten Ständerwicklungen bewirken. Diese starken Stromanstiege in den Ständerwicklungen werden verursacht, weil der Asynchrongenerator bei der Änderung der Netzspannungsamplitude üblicherweise voll erregt ist und permanent mechanische Energie über den Rotor eingeleitet wird. Der bei Netzspannungsänderungen auftretende starke Stromanstieg in den Ständerwicklungen führt zu hohen Induktionsspannungen in den Läuferwicklungen, welche wiederum eine Schädigung der zur Einspeisung des Läuferstroms eingesetzten Umrichter verursachen können. Bei Einsatz eines Spannungszwischenkreis-Umrichters können die Inversdioden des Läuferstromrichters durch die von den in den Läuferwicklungen induzierten Spannungen bewirkten hohen Ströme vollständig zerstört werden. Aus diesem Grund wird die zur Einspeisung der Läuferströme eingesetzte Einspeisungseinrichtung bei bekannten Verfahren zum Betreiben einer Windenergieanlage mit einem Asynchrongenerator bei Änderungen der Zwischenkreisspannung, insbesondere bei durch Kurzschlüsse verursachten Netzspannungseinbrüchen üblicherweise von den Läuferwicklungen entkoppelt, um so eine Beschädigung der Einspeisungseinrichtung bzw. Umrichter durch die in den Läuferwicklungen induzierten Spannungen bzw. Ströme zu vermeiden. Nach Stabilisierung der Netzspannung wird die Läuferstromeinspeisung bei den bekannten Verfahren zur Auferregung des Asynchronge nerators und erneuten Synchronisierung mit dem Netz wieder aufgenommen. Derartige Verfahren sind beispielsweise beschrieben in „Siemens – Energietechnik 5 (1983) Heft 6, S. 364–367: Einsatz einer doppelt gespeisten Asynchronmaschine in der großen Windenergieanlage Grovian. Der Offenbarungsgehalt dieser Schrift hinsichtlich der Entkopplung eines Umrichters von den Läuferwicklungen wird hiermit durch ausdrückliche Inbezugnahme in diese Beschreibung aufgenommen. Die Dauer der Unterbrechung des Betriebs des Asynchrongenerators zwischen dem Netzspannungseinbruch, welcher zum Abfall der Netzspannungsamplitude auf 15% des Sollwertes führen kann, und der Wiederkehr der Netzspannung auf beispielsweise etwa 80% des Sollwertes beträgt üblicherweise nur wenige Sekunden, so daß der durch diese Unterbrechung auftretende Verlust keine nennenswerte Reduzierung des Gesamtwirkungsgrads der Windenergieanlage bedeutet.
- Mit zunehmendem Einsatz regenerativer Energiequellen, wie etwa Windenergieanlagen, zur Stromerzeugung tritt jedoch das Problem auf, daß sich die Dauer der Netzspannungseinbrüche deutlich erhöht, weil nicht genügend Leistung zur raschen Stabilisierung der Netzspannung nach beispielsweise durch einen Kurzschluß verursachten Netzspannungseinbrüchen bereitgestellt werden kann.
- Angesichts dieser Probleme im Stand der Technik liegt der Erfindung die Aufgabe zugrunde, eine Weiterbildung der bekannten Verfahren zum Betreiben einer Windenergieanlage bereitzustellen, mit der die Windenergieanlage ohne Gefährdung ihrer elektrischen Komponenten auch zur Stabilisierung der Netzspannung nach Netzspannungseinbrüchen benutzt werden kann, sowie zur Ausführung derartiger Verfahren einsetzbare Windenergieanlagen bereitzustellen.
- In verfahrensmäßiger Hinsieht wird diese Aufgabe durch eine Weiterbildung der bekannten Verfahren zum Betreiben einer Windenergieanlage gelöst, welche im wesentlichen dadurch gekennzeichnet ist, daß die Läuferstromeinspeisung nach der durch die Änderung der Netzspannungsamplitude verursachten Entkopplung der Einspeisungseinrichtung wieder aufgenommen wird, sobald die durch diese Änderung in den Läuferwicklungen erzeugten Ströme auf einen vorgegebenen Wert abgefallen sind.
- Diese Weiterbildung geht auf die Erkenntnis zurück, daß die bei einem Netzspannungseinbruch in den Läuferwicklungen induzierten hohen Ströme nach Entkoppeln der zur Einspeisung der Läuferströme eingesetzten Umrichter, beispielsweise durch Kurzschließen der Läuferwicklungen über einen niederohmigen Widerstand innerhalb von 50 bis 150 msec abklingen, so daß die Läuferstromeinspeisung nach dieser kurzen Zeit ohne Gefährdung der Umrichter wieder aufgenommen werden kann. Unter zusätzlicher Berücksichtigung der Tatsache, daß selbst bei einem Netzspannungseinbruch auf 15% des Sollwertes noch eine zuverlässige Erfassung der Phasenlage und der Nulldurchgänge möglich ist, kann sofort nach Abklingen der in den Läuferwicklungen induzierten Ströme über entsprechende Steuerung der Amplituden- und Phasenlage der eingespeisten Läuferströme ein geregelter Einspeisebetrieb der Windenergieanlage in das Netz aufgenommen werden. Dadurch trägt die Windenergieanlage zur Stabilisierung der Netzspannung bei, welche nach Netzspannungseinbrüchen üblicherweise für einen Zeitraum von bis zu 500 msec auf einem Wert von etwa 15% der Netzspannung verharren kann, so daß nach Abklingen der induzierten Ströme in den Läuferwicklungen noch ein Zeitraum von mehr als 300 msec verbleibt, in dem die Windenergieanlage zur Stabilisierung der Netzspannung beitragen kann, bevor der Wiederanstieg der Netzspannung zu einem erneuten Anstieg der in den Läuferwicklungen induzierten Ströme führt, welche eine erneute Entkopplung der Einspeisungseinrichtung bzw. Umrichter von den Läuferwicklungen zur Vermeidung von Beschädigungen erforderlich machen kann.
- Während dieses Zeitraums kann ein Vielfaches des Anlagennennstroms in das Netz bzw. in den den Netzspannungseinbruch verursachenden Kurzschluß eingespeist werden.
- Grundsätzlich kann die Wiederaufnahme der Läuferstromeinspeisung unter Berücksichtigung einer vorgegebenen Zeitkonstante erfolgen. Im Hinblick auf eine Erhöhung der Anlagensicherheit hat es sich jedoch als besonders zweckmäßig erwiesen, wenn die Läuferströme 2- oder 3-phasig oder der gleichgerichtete Strom einphasig erfaßt wird und die Wiederaufnahme der Rotorstromeinspeisung erst dann erfolgt, wenn die so erfaßten Ströme auf einen vorgegebenen Wert abgefallen sind. Zur Erfassung der Ströme können Strombildner (stromkompensierte Wandler) eingesetzt werden.
- Bei der Netzspannungswiederkehr muß mit einem Anstieg der Netzspannungsamplitude auf den Sollwert innerhalb von weniger als einer Millisekunde gerechnet werden. Dadurch kann eine Gleich- und eine 50 Hz-Wechselspannung in den Läufer induziert werden, welche eine erneute Entkopplung der Läuferwicklungen von der Einspeisungseinrichtung, beispielsweise durch Kurzschließen der Läuferwicklungen erforderlich machen kann. Der Generator wird über die quasi kurzgeschlossenen Rotorwicklungen teilentregt. Das bedeutet, daß die Gleichkomponente sich abbaut und die 50 Hz-Wechselkomponente aber je nach momentaner Rotordrehzahl noch wirksam ist. Wenn zum Zeitpunkt des Netzspannungseinbruchs (Eintritt der Netzunterspannung) die Drehzahl der Windenergieanlage im untersynchronen Bereich war, führt die Netzspannungswiederkehr dazu, daß die kurzgeschlossene Maschine versucht, motorisch zur Synchrondrehzahl hochzufahren. Das bedeutet, daß die Windenergieanlage bei Netzspannungswiederkehr Strom beziehen kann. Wenn sich die Drehzahl der Windenergieanlage zum Zeitpunkt des Netzspannungseinbruchs (Eintritt der Netzunterspannung) im übersynchronen Bereich befand, führt die Netzspannungswiederkehr dazu, daß die kurzgeschlossene Maschine generatorisch zur Synchrondrehzahl heruntergefahren wird. Das bedeutet, daß die Windenergieanlage bei Netzspannungswiederkehr Strom liefert. Ist die Amplitude des Rotorstroms nach 100 bis 200 msec genügend weit abgeklungen, kann die Läuferstromeinspeisung im Rahmen des erfindungsgemäßen Verfahrens bei Netzspannungswiederkehr erneut aufgenommen werden.
- Wie vorstehend bereits erläutert, hat es sich im Rahmen der Erfindung als besonders günstig erwiesen, wenn die Läuferwicklungen zur Entkopplung von der Einspeisungseinrichtung kurzgeschlossen werden, damit die in den Läuferwicklungen induzierten Ströme besonders schnell abklingen können. Dazu kann eine sogenannte „crow bar" eingesetzt werden, welche die Läuferwicklungen über einen niederohmigen Widerstand, insbesondere Scheinwiderstand, kurzschließt und somit die Erregung aus der Maschine nimmt. Die crow bar kann beispielsweise in Form einer halbgesteuerten B6-Brücke verwirklicht werden. Bei Einsatz eines Spannungszwischenkreis-Umrichters kann gleichzeitig der Läuferstromrichter gesperrt werden, während der Netzumrichter am Netz bleibt und Scheinleistung liefert. Wie vorstehend bereits erläutert, klingen in diesem Fall der Rotor und der Starterstrom abhängig vom Widerstand innerhalb von 50 bis 150 msec ab.
- Bei einer bevorzugten Ausführungsform der Erfindung ist die Steuereinrichtung zum Steuern der Amplituden- und/oder Phasenlage der in die Läuferwicklungen eingespeisten Ströme ausgelegt. Durch Änderung der Phasenlage können Wirk- und Blindleistung des Asynchrongenerators unabhängig voneinander geregelt werden.
- Nachstehend wird die Erfindung unter Bezugnahme auf die Zeichnung, auf die hinsichtlich aller erfindungswesentlichen und in der Beschreibung nicht genauer erläuterten Einzelheiten ausdrücklich verwiesen wird, erläutert. In der Zeichnung zeigt:
-
1 ein Prinzipschaltbild einer erfindungsgemäßen Windenergieanlage mit doppelt gespeistem Asynchrongenerator und Umrichter im Läuferkreis, -
2 eine Detaildarstellung des in1 dargestellten Schaltbildes und -
3 den typischen zeitlichen Verlauf eines Netzspannungseinbruchs. - Gemäß
1 umfaßt eine erfindungsgemäße Windenergieanlage einen um eine im wesentlichen horizontale Rotorachse drehbar gelagerten Rotor10 , der über ein Getriebe20 an einen insgesamt mit30 bezeichneten Asynchrongenerator gekoppelt ist. Der Asynchrongenerator umfaßt an das Netz gekoppelte Ständerwicklungen32 sowie über das Getriebe20 an den Rotor10 gekoppelte Läuferwicklungen34 . - Die Drehfrequenz des Läufers
34 wird mit einem Sensor40 erfaßt. Mit einem insgesamt mit50 bezeichneten Umrichter werden Läuferströme in die Läuferwicklungen eingespeist. Der Umrichter50 umfaßt einen netzseitigen Netzstromrichter52 sowie einen über eine Gleichspannungsschaltung56 daran gekoppelten läuferseitigen Läuferstromrichter54 . Ferner ist ein als sogenannter „crow bar" ausgeführtes Kurzschlußelement60 vorgesehen, mit dem die Wicklungen des Läufers34 über einen niederohmigen Widerstand kurzgeschlossen werden können. Der die Drehfrequenz des Läufers34 erfassende Sensor40 ist mit dem läuferseitigen Läuferstromrichter54 verbunden, um so eine Steuerung der Frequenz der in die Läuferwicklungen eingespeisten Ströme in Abhängigkeit von der Läufer-Drehfrequenz zu ermöglichen. - Gemäß
2 zerfällt ein typischer Netzspannungseinbruch in drei Phasen. In einer ersten Phase fällt die Netzspannungsamplitude sehr rasch innerhalb von weniger als einer Millisekunde auf einen Wert von bis zu 15% des Sollwertes ab. In einer zweiten Phase mit einer Dauer von bis zu 3 Sekunden verharrt die Netzspannungsamplitude auf diesem niedrigen Wert. Schließlich erfolgt in einer dritten Phase mit einer Dauer von 50–150 msec die Netzspannungswiederkehr auf einen Wert von etwa 80% des Sollwertes oder mehr. - Während des Netzspannungseinbruchs in der ersten Phase muß der Umrichter
50 , insbesondere der läuferseitige Läuferstromrichter54 vor einer Beschädigung durch in den Läuferwicklungen induzierte Ströme geschützt werden. Dazu werden die Läuferwicklungen in dieser ersten Phase über das Kurzschlußelement60 kurzgeschlossen und der Läufer stromrichter54 gesperrt. Nach Abklingen der induzierten Ströme in den Läuferwicklungen innerhalb von 50 bis 150 msec wird die Läuferstromeinspeisung über den läuferseitigen Läuferstromrichter54 wieder aufgenommen, in dem das Kurzschlußelement („crow bar") wieder ausgeschaltet und der Rotorstromgleichrichter wieder freigegeben wird. Danach steht die Windenergieanlage wieder zur Stabilisierung der Netzspannung zur Verfügung. Bei der Netzspannungswiederkehr in der dritten Phase kann ggf. eine erneute Entkopplung des Umrichters von den Läuferwicklungen erfolgen, um so eine Beschädigung des Umrichters durch während der Spannungswiederkehr in den Läuferwicklungen induzierte Ströme zu verhindern. - Wie in
2 dargestellt, kann das Kurzschlußelement60 („crow bar") in Form einer B6-Brücke verwirklicht sein. In diesem Fall kann das Abklingen der gleichgerichteten Läuferströme über einen Strombildner-Widerstand62 in der B6-Brücke erfolgen. Sobald die Zwischenkreisspannung in dem Umrichter50 bedingt durch zu hohe Läuferströme einen vorgegebenen Wert überschreitet, wird die als B6-Brücke ausgeführte crow bar gezündet. Dann läuft die gleiche Prozedur ab, wie bei einem Netzkurzschluß. Sollte durch kurzfristige Netzunterspannung ein zu großer Strom im Rotor auftreten, verhält sich die Anlage wirklich wie bei einem Netzkurzschluß.
Claims (10)
- Verfahren zum Betreiben einer Windenergieanlage, bei dem von einer Einspeisungseinrichtung mit Läuferströmen gespeiste Läuferwicklungen eines an ein Spannungsnetz gekoppelte Ständerwicklungen aufweisenden Asynchrongenerators mit einem Rotor der Windenergieanlage angetrieben werden, die Frequenzen der eingespeisten Läuferströme in Abhängigkeit von der Läufer-Drehfrequenz gesteuert und die Einspeisungseinrichtung bei vorgegebenen Änderungen der Netzspannungsamplituden elektrisch von den Läuferwicklungen entkoppelt wird, dadurch gekennzeichnet, daß die Läuferstromeinspeisung nach der durch die Änderung der Netzspannungsamplitude verursachten Entkopplung wieder aufgenommen wird, sobald die durch diese Änderung in den Läuferwicklungen erzeugten Ströme auf einen vorgegebenen Wert abgefallen sind.
- Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Läuferströme über einen an die Netzspannung gekoppelten Umrichter, insbesondere Spannungszwischenkreis-Umrichter mit einem läuferseitigen Läuferstromrichter und einem netzseitigen Netzumrichter, eingespeist werden.
- Verfahren nach Anspruch 2, dadurch gekennzeichnet, daß der Netzumrichter bei der Entkopplung an das Netz gekoppelt bleibt und der Läuferstromrichter gesperrt wird.
- Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Läuferwicklungen bei der Entkopplung kurzgeschlossen werden.
- Windenergieanlage zur Ausführung eines Verfahrens nach einem der vorhergehenden Ansprüche mit einem mindestens ein Rotorblatt aufweisenden und bzgl. einer etwa horizontal verlaufenden Rotorachse drehbar gelagerten Rotor, einem Asynchrongenerator, dessen Läuferwicklungen an den Rotor gekoppelt und dessen Ständerwicklungen an ein Spannungsnetz koppelbar sind, einer Einspeisungseinrichtung zum Einspeisen von Strömen in die Läuferwicklungen, einer Steuereinrichtung zum Steuern der Frequenz der eingespeisten Ströme in Abhängigkeit von der Läufer-Drehfrequenz und einer zum elektrischen Entkoppeln der Einspeisungseinrichtung von den Läuferwicklungen bei Änderungen der Netzspannungsamplituden betreibbaren Sicherungseinrichtung, dadurch gekennzeichnet, daß die Sicherungseinrichtung eine Freigabeanordnung aufweist, mit der die Läuferstromeinspeisung nach der Entkopplung wieder freigegeben wird, sobald die durch die die Ent kopplung auslösende Änderung der Netzspannungsamplitude in den Läuferwicklungen erzeugten Ströme auf einen vorgegebenen Wert abgefallen sind.
- Windenergieanlage nach Anspruch 5, dadurch gekennzeichnet, daß der Rotor über ein Getriebe an die Läuferwicklungen gekoppelt ist.
- Windenergieanlage nach Anspruch 5 oder 6, dadurch gekennzeichnet, daß die Einspeisungseinrichtung einen an die Netzspannung gekoppelten Umrichter aufweist.
- Windenergieanlage nach Anspruch 7, dadurch gekennzeichnet, daß der Umrichter ein Spannungszwischenkreis-Umrichter mit einem läuferseitigen Läuferstromrichter und einem netzseitigen Netzstromrichter ist.
- Windenergieanlage nach einem der Ansprüche 5 bis 8, dadurch gekennzeichnet, daß die Sicherungseinrichtung ein zum Kurzschließen der Läuferwicklungen betreibbares Kurzschlußelement („crow bar") aufweist.
- Windenergieanlage nach einem der Ansprüche 5 bis 9, dadurch gekennzeichnet, daß die Steuereinrichtung zum Steuern der Amplituden- und/oder der Phasenlage der in die Läuferwicklungen eingespeisten Ströme ausgelegt ist.
Priority Applications (10)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10232423A DE10232423A1 (de) | 2002-07-17 | 2002-07-17 | Verfahren zum Betreiben einer Windenergieanlage und Windenergieanlage zum Ausführen derartiger Verfahren |
CNB038168480A CN100367661C (zh) | 2002-07-17 | 2003-07-17 | 风力发电设备及其操作方法 |
CA2491833A CA2491833C (en) | 2002-07-17 | 2003-07-17 | Method for operating a wind power plant |
AU2003250089A AU2003250089B2 (en) | 2002-07-17 | 2003-07-17 | Method for operating a wind power plant and method for operating it |
EP03763883A EP1525658A1 (de) | 2002-07-17 | 2003-07-17 | Windkraftanlage und ihres betriebsverfahren |
CZ20050029A CZ200529A3 (cs) | 2002-07-17 | 2003-07-17 | Zpusob cinnosti vetrné turbíny a vetrná turbína pro provádení tohoto zpusobu |
BRPI0312898A BRPI0312898A2 (pt) | 2002-07-17 | 2003-07-17 | método para a operação de uma planta eólica e método para operá-la |
PCT/EP2003/007776 WO2004008627A1 (en) | 2002-07-17 | 2003-07-17 | Method for operating a wind power plant and method for operating it |
US10/521,614 US7321221B2 (en) | 2002-07-17 | 2003-07-17 | Method for operating a wind power plant and method for operating it |
US11/955,360 US7471007B2 (en) | 2002-07-17 | 2007-12-12 | Method for operating a wind power plant and method for operating it |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10232423A DE10232423A1 (de) | 2002-07-17 | 2002-07-17 | Verfahren zum Betreiben einer Windenergieanlage und Windenergieanlage zum Ausführen derartiger Verfahren |
Publications (1)
Publication Number | Publication Date |
---|---|
DE10232423A1 true DE10232423A1 (de) | 2004-01-29 |
Family
ID=29796414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE10232423A Ceased DE10232423A1 (de) | 2002-07-17 | 2002-07-17 | Verfahren zum Betreiben einer Windenergieanlage und Windenergieanlage zum Ausführen derartiger Verfahren |
Country Status (9)
Country | Link |
---|---|
US (2) | US7321221B2 (de) |
EP (1) | EP1525658A1 (de) |
CN (1) | CN100367661C (de) |
AU (1) | AU2003250089B2 (de) |
BR (1) | BRPI0312898A2 (de) |
CA (1) | CA2491833C (de) |
CZ (1) | CZ200529A3 (de) |
DE (1) | DE10232423A1 (de) |
WO (1) | WO2004008627A1 (de) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004007461A1 (de) * | 2004-02-13 | 2005-09-01 | Helgers Finanzberatung Gmbh | Verfahren zum Betreiben einer Windkraftanlage, und dementsprechend ausgestaltete Windkraftanlage |
DE102004016450A1 (de) * | 2004-03-31 | 2005-10-20 | Alstom Technology Ltd Baden | Generatorbeschaltung und Verfahren zur Erzeugung einer regelbaren Bremsleistung in einer Turbinenanlage |
DE102007042246A1 (de) * | 2007-09-06 | 2009-05-14 | Woodward Seg Gmbh & Co. Kg | Verfahren und Regeleinheit zur Kurzschlußstromreduktion bei einer doppeltgespeisten Asynchronmaschine |
DE102009027981A1 (de) * | 2009-07-23 | 2011-01-27 | Suzlon Energy Gmbh | Verfahren zum Betreiben einer an einem Stromnetz angeschlossenen Windturbine sowie zur Durchführung des Verfahrens geeignete Windturbine |
Families Citing this family (69)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19756777B4 (de) * | 1997-12-19 | 2005-07-21 | Wobben, Aloys, Dipl.-Ing. | Verfahren zum Betreiben einer Windenergieanlage sowie Windenergieanlage |
DE10119624A1 (de) | 2001-04-20 | 2002-11-21 | Aloys Wobben | Verfahren zum Betreiben einer Windenergieanlage |
NZ528765A (en) * | 2001-04-20 | 2006-11-30 | Aloys Wobben | Method for operating a wind energy plant in which the power is regulated in response to a current supplied to a load |
EP1625457A4 (de) | 2003-05-02 | 2015-04-22 | Xantrex Technology Inc | Steuersystem für zweifach gespeisten induktionsgenerator |
EP1499009B1 (de) * | 2003-07-15 | 2007-10-31 | Gamesa Innovation & Technology, S.L. Unipersonal | Steuer- und Schutzgerät für ein doppelgespeistes Induktionsgeneratorsystem |
US7528496B2 (en) * | 2003-09-03 | 2009-05-05 | Repower Systems Ag | Method for operating or controlling a wind turbine and method for providing primary control power by means of wind turbines |
JP4269941B2 (ja) * | 2004-01-08 | 2009-05-27 | 株式会社日立製作所 | 風力発電装置およびその制御方法 |
DE102004003657B4 (de) * | 2004-01-24 | 2012-08-23 | Semikron Elektronik Gmbh & Co. Kg | Stromrichterschaltungsanordnung und zugehöriges Ansteuerverfahren für Generatoren mit dynamisch veränderlicher Leistungsabgabe |
DE102004013131A1 (de) * | 2004-03-17 | 2005-10-06 | Siemens Ag | Windkraftanlage |
EP1679787A1 (de) * | 2005-01-07 | 2006-07-12 | Siemens Aktiengesellschaft | Stromaggregat und Verfahren zur Erzeugung von Strom einer vorbestimmten Netzfrequenz |
EP1752660B1 (de) * | 2005-08-12 | 2013-04-03 | General Electric Company | Schutzeinrichtung gegen Überspannungen in einer Windkraftanlage |
US7816801B2 (en) * | 2006-03-16 | 2010-10-19 | International Components Corporation, Inc. | Speed sensing circuit for a wind turbine generator |
CN101401294B (zh) * | 2006-03-17 | 2013-04-17 | 英捷电力技术有限公司 | 具有激励器设备和不连接至电网的功率变换器的变速风机 |
US7425771B2 (en) | 2006-03-17 | 2008-09-16 | Ingeteam S.A. | Variable speed wind turbine having an exciter machine and a power converter not connected to the grid |
US7417332B2 (en) * | 2006-08-24 | 2008-08-26 | General Electric Company | Method and apparatus of monitoring a machine |
US7394166B2 (en) * | 2006-10-04 | 2008-07-01 | General Electric Company | Method, apparatus and computer program product for wind turbine start-up and operation without grid power |
DE102006051546A1 (de) * | 2006-11-02 | 2008-05-08 | Nordex Energy Gmbh | Verfahren zum Betrieb einer Windenergieanlage mit einem doppelt gespeisten Asynchrongenerator sowie Windenergieanlage mit einem doppelt gespeisten Asynchrongenerator |
US7642666B2 (en) * | 2006-11-02 | 2010-01-05 | Hitachi, Ltd. | Wind power generation apparatus, wind power generation system and power system control apparatus |
WO2008081049A1 (es) * | 2006-12-28 | 2008-07-10 | Wind To Power System, S.L. | Generador asíncrono con control de la tensión aplicada al estator |
US7622815B2 (en) * | 2006-12-29 | 2009-11-24 | Ingeteam Energy, S.A. | Low voltage ride through system for a variable speed wind turbine having an exciter machine and a power converter not connected to the grid |
EP2140137B1 (de) * | 2007-04-30 | 2013-04-10 | Vestas Wind Systems A/S | Windturbine mit variabler geschwindigkeit und doppelt gespeistem induktionsgenerator mit ausgleich für die variable rotorgeschwindigkeit |
WO2008137836A1 (en) * | 2007-05-04 | 2008-11-13 | The University Of Alabama | Converter control of variable-speed wind turbines |
DE102007032179A1 (de) * | 2007-07-10 | 2009-01-22 | Repower Systems Ag | Windenergieanlage mit erweitertem Drehzahlbereich |
DE102007035570A1 (de) | 2007-07-26 | 2009-02-05 | Universität Kassel | Doppelt gespeister Asynchrongenerator und Verfahren zu dessen Betrieb |
WO2009045218A1 (en) | 2007-10-04 | 2009-04-09 | Donovan John J | A video surveillance, storage, and alerting system having network management, hierarchical data storage, video tip processing, and vehicle plate analysis |
US8013738B2 (en) | 2007-10-04 | 2011-09-06 | Kd Secure, Llc | Hierarchical storage manager (HSM) for intelligent storage of large volumes of data |
DE102007060958A1 (de) * | 2007-12-14 | 2009-06-25 | Repower Systems Ag | Steuereinrichtung für Windenergieanlagen mit Netzausfallerkennung |
US8198742B2 (en) * | 2007-12-28 | 2012-06-12 | Vestas Wind Systems A/S | Variable speed wind turbine with a doubly-fed induction generator and rotor and grid inverters that use scalar controls |
CA2753879A1 (en) * | 2008-02-29 | 2009-09-03 | Efficient Drivetrains, Inc. | Improved wind turbine systems using continuously variable transmissions and controls |
DE102008017715A1 (de) * | 2008-04-02 | 2009-10-15 | Nordex Energy Gmbh | Verfahren zum Betreiben einer Windenergieanlage mit einer doppelt gespeisten Asynchronmaschine sowie Windenergieanlage mit einer doppelt gespeisten Asynchronmaschine |
JP4834691B2 (ja) * | 2008-05-09 | 2011-12-14 | 株式会社日立製作所 | 風力発電システム |
DE102008049630A1 (de) * | 2008-09-30 | 2010-04-08 | Repower Systems Ag | Überspannungsschutzgerät für Windenergieanlagen |
EP2378656B1 (de) * | 2009-01-14 | 2018-04-04 | Toshiba Mitsubishi-Electric Industrial Systems Corporation | Schutzschaltung für eine windkraftanlage mit doppeltgespeistem asynchrongenerator |
TWM357517U (en) * | 2009-01-14 | 2009-05-21 | Sunyen Co Ltd | Wind-powered electric generator |
US8299642B2 (en) * | 2009-02-10 | 2012-10-30 | Hitachi, Ltd. | Wind power generation system |
US8839254B2 (en) * | 2009-06-26 | 2014-09-16 | Microsoft Corporation | Precomputation for data center load balancing |
DE102009038033A1 (de) * | 2009-08-19 | 2011-02-24 | Wobben, Aloys | Elektrische Ladevorrichtung |
CN101741100A (zh) * | 2010-01-11 | 2010-06-16 | 华锐风电科技(集团)股份有限公司 | 低电压穿越控制方案 |
US10137542B2 (en) | 2010-01-14 | 2018-11-27 | Senvion Gmbh | Wind turbine rotor blade components and machine for making same |
CA2786561C (en) | 2010-01-14 | 2018-03-20 | Neptco, Inc. | Wind turbine rotor blade components and methods of making same |
US9207993B2 (en) | 2010-05-13 | 2015-12-08 | Microsoft Technology Licensing, Llc | Dynamic application placement based on cost and availability of energy in datacenters |
US9391554B2 (en) | 2010-08-25 | 2016-07-12 | University Of Alabama | Control of a permanent magnet synchronous generator wind turbine |
CN103141004B (zh) * | 2010-09-22 | 2016-12-07 | 东芝三菱电机产业系统株式会社 | 电力转换装置 |
US8849469B2 (en) | 2010-10-28 | 2014-09-30 | Microsoft Corporation | Data center system that accommodates episodic computation |
US9063738B2 (en) | 2010-11-22 | 2015-06-23 | Microsoft Technology Licensing, Llc | Dynamically placing computing jobs |
US20120147637A1 (en) | 2010-12-13 | 2012-06-14 | Northern Power Systems, Inc. | Methods, Systems, and Software for Controlling a Power Converter During Low (Zero)-Voltage Ride-Through Conditions |
CN102055207B (zh) * | 2010-12-16 | 2012-08-01 | 南京飓能电控自动化设备制造有限公司 | 低电压穿越智能功率控制单元及其应用 |
KR101145485B1 (ko) * | 2011-01-03 | 2012-05-15 | 현대중공업 주식회사 | 풍력발전기용 크로우바 회로 |
DE102011000459B4 (de) * | 2011-02-02 | 2017-11-02 | Universität Kassel | Verfahren zur Lieferung von Blindstrom mit einem Umrichter sowie Umrichteranordnung und Energieversorgungsanlage |
US9450838B2 (en) | 2011-06-27 | 2016-09-20 | Microsoft Technology Licensing, Llc | Resource management for cloud computing platforms |
US9595054B2 (en) | 2011-06-27 | 2017-03-14 | Microsoft Technology Licensing, Llc | Resource management for cloud computing platforms |
US8491262B2 (en) | 2011-10-27 | 2013-07-23 | General Electric Company | Method for shut down of a wind turbine having rotor blades with fail-safe air brakes |
US9450415B2 (en) | 2012-08-31 | 2016-09-20 | General Electric Company | System and method for controlling a dual-fed induction generator in response to high-voltage grid events |
US9671442B2 (en) | 2012-11-30 | 2017-06-06 | General Electric Company | System and method for detecting a grid event |
US9267491B2 (en) | 2013-07-02 | 2016-02-23 | General Electric Company | Wind turbine rotor blade having a spoiler |
JP6071912B2 (ja) * | 2014-01-27 | 2017-02-01 | 株式会社東芝 | 過電圧保護装置および電流調整回路 |
WO2016000220A1 (en) * | 2014-07-02 | 2016-01-07 | Ge Energy Power Conversion Technology Ltd | Overvoltage protection self-trigger circuit for double fed induction generator (dfig) wind power system |
US10234835B2 (en) | 2014-07-11 | 2019-03-19 | Microsoft Technology Licensing, Llc | Management of computing devices using modulated electricity |
US9933804B2 (en) | 2014-07-11 | 2018-04-03 | Microsoft Technology Licensing, Llc | Server installation as a grid condition sensor |
US9467081B2 (en) * | 2014-09-29 | 2016-10-11 | Ingeteam Power Technology, S.A. | Protection system for a power converter connected to a doubly fed induction generator |
WO2016119791A1 (en) * | 2015-01-29 | 2016-08-04 | Vestas Wind Systems A/S | Partial and full load controllers of a wind turbine |
DK3051124T3 (en) * | 2015-01-30 | 2018-10-15 | Adwen Gmbh | Procedure for operating a wind turbine without mains connection and a wind turbine |
DE102015208554A1 (de) * | 2015-05-07 | 2016-11-10 | Wobben Properties Gmbh | Verfahren zum Betreiben einer Windenergieanlage |
US9705440B2 (en) * | 2015-07-16 | 2017-07-11 | Hamilton Sundstrand Corporation | Fault tolerant electric power generating system |
CN105356504B (zh) * | 2015-11-19 | 2017-12-08 | 上海电机学院 | 一种变流器和其控制方法及风力发电系统 |
DE102017108562A1 (de) | 2017-04-21 | 2018-10-25 | Wobben Properties Gmbh | Ladestation zum Laden mehrerer Elektrofahrzeuge, insbesondere Elektroautomobile |
US10630215B2 (en) * | 2017-11-20 | 2020-04-21 | General Electric Company | System and method for operating a doubly fed induction generator system to reduce harmonics |
EP3954896A1 (de) * | 2020-08-14 | 2022-02-16 | Wobben Properties GmbH | Pendeldämpfung bei windenergieanlagen |
RU2770526C1 (ru) * | 2021-10-14 | 2022-04-18 | Федеральное государственное бюджетное образовательное учреждение высшего образования «Ставропольский государственный аграрный университет» | Ветроэнергетическая установка |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0309814A1 (de) * | 1987-09-28 | 1989-04-05 | Siemens Aktiengesellschaft | Anordnung zur Erzeugung elektrischer Energie |
DE19735742A1 (de) * | 1997-08-18 | 1999-02-25 | Siemens Ag | Über- und untersynchrone Stromrichterkaskade |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3483463A (en) * | 1966-10-13 | 1969-12-09 | Otto J M Smith | System and method for alternating current machines,and apparatus therefor |
US4357542A (en) * | 1979-07-12 | 1982-11-02 | Westinghouse Electric Corp. | Wind turbine generator system |
US4461957A (en) * | 1982-06-17 | 1984-07-24 | Control Data Corporation | Speed tolerant alternator system for wind or hydraulic power generation |
US4565929A (en) * | 1983-09-29 | 1986-01-21 | The Boeing Company | Wind powered system for generating electricity |
US5083039B1 (en) * | 1991-02-01 | 1999-11-16 | Zond Energy Systems Inc | Variable speed wind turbine |
WO1997004521A1 (en) * | 1995-07-18 | 1997-02-06 | Midwest Research Institute | A variable speed wind turbine generator system with zero-sequence filter |
US5798631A (en) * | 1995-10-02 | 1998-08-25 | The State Of Oregon Acting By And Through The State Board Of Higher Education On Behalf Of Oregon State University | Performance optimization controller and control method for doubly-fed machines |
US6137187A (en) * | 1997-08-08 | 2000-10-24 | Zond Energy Systems, Inc. | Variable speed wind turbine generator |
US6420795B1 (en) * | 1998-08-08 | 2002-07-16 | Zond Energy Systems, Inc. | Variable speed wind turbine generator |
FR2801444B1 (fr) * | 1999-11-24 | 2002-02-08 | Dassault Aviat | Generateur electrique autonome, notamment pour aeronef |
US6285533B1 (en) * | 1999-12-13 | 2001-09-04 | Kabushiki Kaisha Toshiba | Method of and apparatus for controlling the operation of variable speed gearing |
EP1284045A1 (de) * | 2000-05-23 | 2003-02-19 | Vestas Wind System A/S | Windturbine variabler geschwindigkeit mit einem matrixwandler |
US7015595B2 (en) * | 2002-02-11 | 2006-03-21 | Vestas Wind Systems A/S | Variable speed wind turbine having a passive grid side rectifier with scalar power control and dependent pitch control |
JP4269941B2 (ja) * | 2004-01-08 | 2009-05-27 | 株式会社日立製作所 | 風力発電装置およびその制御方法 |
US7355294B2 (en) * | 2006-05-22 | 2008-04-08 | General Electric Company | Method and system for wind turbine blade movement |
-
2002
- 2002-07-17 DE DE10232423A patent/DE10232423A1/de not_active Ceased
-
2003
- 2003-07-17 CZ CZ20050029A patent/CZ200529A3/cs unknown
- 2003-07-17 EP EP03763883A patent/EP1525658A1/de not_active Withdrawn
- 2003-07-17 CA CA2491833A patent/CA2491833C/en not_active Expired - Fee Related
- 2003-07-17 US US10/521,614 patent/US7321221B2/en not_active Expired - Lifetime
- 2003-07-17 WO PCT/EP2003/007776 patent/WO2004008627A1/en not_active Application Discontinuation
- 2003-07-17 CN CNB038168480A patent/CN100367661C/zh not_active Expired - Fee Related
- 2003-07-17 BR BRPI0312898A patent/BRPI0312898A2/pt not_active IP Right Cessation
- 2003-07-17 AU AU2003250089A patent/AU2003250089B2/en not_active Ceased
-
2007
- 2007-12-12 US US11/955,360 patent/US7471007B2/en not_active Expired - Lifetime
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0309814A1 (de) * | 1987-09-28 | 1989-04-05 | Siemens Aktiengesellschaft | Anordnung zur Erzeugung elektrischer Energie |
DE19735742A1 (de) * | 1997-08-18 | 1999-02-25 | Siemens Ag | Über- und untersynchrone Stromrichterkaskade |
Non-Patent Citations (2)
Title |
---|
BATTISTA,Hernan,et.al.: Dynamical Sliding Mode Power Control of Wind Driven Induction Generators. In: IEEE Transactions of Energy Conversions,Vol.15,Nr.4,12,2000, S.451-457 * |
BATTISTA,Hernan,et.al.: Dynamical Sliding Mode Power Control of Wind Driven Induction Generators. In: IEEE Transactions of Energy Conversions,Vol.15,Nr.4,12,2000, S.451-457; |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004007461A1 (de) * | 2004-02-13 | 2005-09-01 | Helgers Finanzberatung Gmbh | Verfahren zum Betreiben einer Windkraftanlage, und dementsprechend ausgestaltete Windkraftanlage |
DE102004016450A1 (de) * | 2004-03-31 | 2005-10-20 | Alstom Technology Ltd Baden | Generatorbeschaltung und Verfahren zur Erzeugung einer regelbaren Bremsleistung in einer Turbinenanlage |
DE102007042246A1 (de) * | 2007-09-06 | 2009-05-14 | Woodward Seg Gmbh & Co. Kg | Verfahren und Regeleinheit zur Kurzschlußstromreduktion bei einer doppeltgespeisten Asynchronmaschine |
DE102009027981A1 (de) * | 2009-07-23 | 2011-01-27 | Suzlon Energy Gmbh | Verfahren zum Betreiben einer an einem Stromnetz angeschlossenen Windturbine sowie zur Durchführung des Verfahrens geeignete Windturbine |
DE102009027981B4 (de) * | 2009-07-23 | 2011-04-28 | Suzlon Energy Gmbh | Verfahren zum Betreiben einer an einem Stromnetz angeschlossenen Windturbine sowie zur Durchführung des Verfahrens geeignete Windturbine |
Also Published As
Publication number | Publication date |
---|---|
US7321221B2 (en) | 2008-01-22 |
CN100367661C (zh) | 2008-02-06 |
CZ200529A3 (cs) | 2006-01-11 |
CN1669212A (zh) | 2005-09-14 |
US20060163881A1 (en) | 2006-07-27 |
EP1525658A1 (de) | 2005-04-27 |
WO2004008627A1 (en) | 2004-01-22 |
US20080093854A1 (en) | 2008-04-24 |
AU2003250089A1 (en) | 2004-02-02 |
US7471007B2 (en) | 2008-12-30 |
AU2003250089B2 (en) | 2007-08-30 |
CA2491833A1 (en) | 2004-01-22 |
CA2491833C (en) | 2014-10-14 |
BRPI0312898A2 (pt) | 2016-06-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE10232423A1 (de) | Verfahren zum Betreiben einer Windenergieanlage und Windenergieanlage zum Ausführen derartiger Verfahren | |
EP1921738B1 (de) | Verfahren und Vorrichtung zum Betrieb eines Umrichters, insbesondere für Windenergieanlagen | |
EP1384002B1 (de) | Verfahren zum betreiben einer windenergieanlage | |
EP2457320B1 (de) | Verfahren zum betreiben einer windturbine sowie dazu geeignete windturbine | |
EP2872777B1 (de) | Verfahren zum steuern eines elektrischen erzeugers | |
DE60317183T2 (de) | Steuer- und Schutzgerät für ein doppelgespeistes Induktionsgeneratorsystem | |
EP2087571B1 (de) | Umrichter mit steuerbarem phasenwinkel | |
EP2411669A2 (de) | Verfahren zum betreiben einer windenergieanlage | |
DE2748373A1 (de) | Torsionsschutzeinrichtung fuer den stabilisator eines krafterzeugungssystems | |
WO2003030329A1 (de) | Verfahren zum betrieb eines windparks | |
DE3002945A1 (de) | Umformersystem | |
EP3512064A1 (de) | Steuerung einer windenergieanlage durch änderung von drehzahlparametern | |
DE10117212A1 (de) | Verfahren zum Betrieb einer Windenergieanlage | |
EP2265816B1 (de) | Doppelt gespeister asynchrongenerator und verfahren zu dessen betrieb | |
EP1548278B1 (de) | Windenergieanlage mit einer eigenversorgten Steuereinrichtung mit einem Wirkleistungs- und Blindleistungsregelmodul | |
AT515058B1 (de) | Verfahren zum Betreiben eines mit einem Energieversorgungsnetz verbundenen Generators | |
DE102011111210A1 (de) | Verfahren zum Betreiben einer Windenergieanlage bei Auftreten eines Netzfehlers mit einem Spannungsrückgang sowie eine solche Windenergieanlage | |
EP2963803A1 (de) | Versorgung einer Synchronmaschine mit einem Erregerstrom | |
EP2417681A2 (de) | Energieeinspeisung in ein stromnetz | |
DE102005050486B4 (de) | Energieumwandlungseinheit | |
DE102012208946A1 (de) | Vorrichtung und Verfahren zum Anfahren eines Generators | |
WO2021213854A1 (de) | Verbessertes fehlerklärungsverhalten von netzgekoppelten umrichteranlagen an drehzahlvariablen generatorantrieben | |
EP0783793A1 (de) | Wechselstrommaschine | |
EP0345204A2 (de) | Windkraftanlage | |
EP1471630A2 (de) | Drehstrommaschine und Vorrichtung sowie Verfahren zur Speisung eines elektrischen Netzes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OM8 | Search report available as to paragraph 43 lit. 1 sentence 1 patent law | ||
ON | Later submitted papers | ||
8127 | New person/name/address of the applicant |
Owner name: GENERAL ELECTRIC CO., SCHENECTADY, N.Y., US |
|
8128 | New person/name/address of the agent |
Representative=s name: ZIMMERMANN & PARTNER, 80331 MUENCHEN |
|
8110 | Request for examination paragraph 44 | ||
R079 | Amendment of ipc main class |
Free format text: PREVIOUS MAIN CLASS: F03D0007000000 Ipc: H02P0009100000 |
|
R079 | Amendment of ipc main class |
Free format text: PREVIOUS MAIN CLASS: F03D0007000000 Ipc: H02P0009100000 Effective date: 20131028 |
|
R002 | Refusal decision in examination/registration proceedings | ||
R003 | Refusal decision now final |